ADVANCE · DAVIE COUNTY · NC

Building Demolition in Advance, NC

Building Demolition in Advance and across Davie County, with a free site visit, a fixed quote and one crew from start to finish.

Service areaAdvance & Davie County
PopulationAbout 1,600
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free building demolition quote in Advance

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

About our building demolition work in Advance

Winston-Salem is 13 miles from Advance, and we cover both.

Everything the service includes is set out on our main building demolition page; this page covers what is specific to Advance.

QUICK ANSWERS

Building Demolition permit
Required; we file it with the county
Population
About 1,600
Region
Piedmont
Owner-occupied homes
82%
Elevation
About 830 ft

Building Demolition and the Advance housing stock

Of Advance’s roughly 620 homes, 26% were built before 1980 and the median dates from 1997, newer than the Davie County median of 1990 (American Community Survey). In practice, in Advance demolition is more often about garages, additions and accessory buildings than whole houses.

With 82% owner-occupancy against 66% statewide, building demolition in Advance is mostly arranged directly with owners.

Advance’s growth and demand for building demolition

With no town government, Advance (about 1,600 residents) falls under Davie County for permits and ordinances.

Most building demolition requests here come from older buildings reaching the end of their life and lots being cleared for new construction.

Soil and ground conditions for building demolition in Advance

The USDA soil survey maps Pacolet soils at 4 of nine points we checked across Advance. They are well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 2–45%. The survey rates the ground “not limited” for homes with basements.

Advance and nearby towns for building demolition

About 13 miles from Winston-Salem, Advance is part of our Davie County service area for building demolition.

Advance sits about 830 feet above sea level (Advance on Wikipedia).

Advance residents can find ordinances and permit contacts on the Davie County website.

We also provide building demolition in Bermuda Run, Yadkin College, Clemmons and Welcome.

Advance places that shape our building demolition work

  • John Edward Belle Shutt House and Outbuildings (about 1 mi from Advance). The streets near John Edward Belle Shutt House and Outbuildings are part of our Advance service area for building demolition.
  • Grimes-Crotts Mill (about 2 mi from Advance). Grimes-Crotts Mill is a reminder of Advance’s working past; on older sites nearby, sorting brick, timber and metal for reuse is part of building demolition.
  • Jesse Helms Center (about 3 mi from Advance). Busy destinations like Jesse Helms Center bring traffic, so we plan hauling routes and times for building demolition to stay out of the way.

Where debris from building demolition in Advance goes

The nearest active C&D transfer station on the NC DEQ Solid Waste Section permitted list is Abbey Green Transfer Station in Winston-Salem, about 11 miles from Advance. Clean concrete, brick and stumps have a closer option at Veach Landfill, L.L.C. in Winston-Salem, an LCID landfill about 12 miles away.

Advance rules that apply to building demolition

The Davie County inspections office issues demolition permits for Advance addresses. When a permit is needed, we file it with Davie County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Advance are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.

We follow the requirements of OSHA: Demolition safety, EPA: Asbestos NESHAP, OSHA: Cranes and derricks and OSHA: Fall protection on every Advance job.

When to book building demolition in Advance

Advance, around 830 feet up, sees warm, wet summers and mild winters, with ice storms a few times a decade. Most Advance customers book building demolition for October and November. July and August bring heat that limits crew hours and afternoon storms that turn bare clay to mud.

Davie County remembers its storms. In December 2002 an ice storm left well over a million Piedmont homes without power as trees and lines came down.

What building demolition costs in Advance

What is specific to pricing building demolition in Advance:

  • Advance home values. The typical Advance home is valued near $359,000, a useful yardstick when deciding whether building demolition pays off at sale or rebuild.

Building Demolition near Advance: map

Get a free building demolition quote in Advance

ADVANCE · DAVIE COUNTY

Need building demolition in Advance?

One call or message gets a free Advance site visit and a price with every line spelled out.

LIVE · NATIONAL WEATHER SERVICE

Building Demolition weather outlook for Advance this week

How the next seven days in Advance, Davie County affect building demolition, from the official National Weather Service forecast.

Loading the latest forecast for Advance…

READY TO CLEAR THE SITE?

Tell us about your building demolition project in Advance.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Building Demolition in Advance: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Do I need a permit for building demolition in Advance?

The Davie County inspections office issues demolition permits for Advance addresses.

Where can I check Advance permit rules myself?

The Davie County website publishes local ordinances and permit contacts.

Do you work near Hampton House in Advance?

It is. We plan building demolition near Hampton House around traffic, visitors and anything historic nearby.

What is the soil like in Advance?

The USDA soil survey shows mostly Pacolet soils, well drained.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp