ICARD · BURKE COUNTY · NC

Building Demolition in Icard, NC

Building Demolition in Icard and across Burke County, with a free site visit, a fixed quote and one crew from start to finish.

Service areaIcard & Burke County
PopulationAbout 2,000
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free building demolition quote in Icard

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

Building Demolition services in Icard, NC

Icard is about 36 miles from Gastonia, and our crews work across the area.

Everything the service includes is set out on our main building demolition page; this page covers what is specific to Icard.

QUICK ANSWERS

Building Demolition permit
Required; we file it with the county
Population
About 2,000
Region
Mountains
Owner-occupied homes
72%
Elevation
About 1,194 ft

Building Demolition and the Icard housing stock

Of Icard’s roughly 1,148 homes, 49% were built before 1980 and the median dates from 1981, close to the Burke County median of 1980 (American Community Survey). In practice, many Icard teardowns start with an asbestos and lead survey.

The median Icard home is worth about $137,000, a little below the Burke County median of $171,000.

Icard’s growth and demand for building demolition

Icard is an unincorporated community of about 2,000 people in Burke County, so county rules generally apply rather than a town’s.

Most building demolition requests here come from older buildings reaching the end of their life and lots being cleared for new construction.

Soil and ground conditions for building demolition in Icard

Across Icard, the most common soil in the USDA soil survey is the Fairview series (9 of nine sample points). It is well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 2–15%. The survey rates the ground “not limited” for homes with basements.

Where we provide building demolition near Icard

About 36 miles from Gastonia, Icard is part of our Burke County service area for building demolition.

Icard sits about 1,194 feet above sea level (Icard on Wikipedia).

For local ordinances and permit contacts, see the Burke County website.

Building Demolition is also available in Rutherford College, Valdese, Drexel, Morganton, Salem and Glen Alpine, all in Burke County.

We also provide building demolition in Hildebran, Connelly Springs, Rhodhiss and Long View.

Where debris from building demolition in Icard goes

Mixed demolition debris from Icard can go to Burke County Johns River Waste Management in Morganton, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 11 miles off. Inert debris such as concrete and brick can also go to Little Mountain Construction LCID in Maiden, a permitted LCID landfill roughly 24 miles from Icard.

Permits and rules for building demolition in Icard

The Burke County inspections office issues demolition permits for Icard addresses. When a permit is needed, we file it with Burke County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Icard are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.

Agencies whose rules apply to this work in Burke County: OSHA: Demolition safety, EPA: Asbestos NESHAP, OSHA: Cranes and derricks and OSHA: Fall protection. Flood maps for Icard are on the NC Flood Risk Information System.

When to book building demolition in Icard

Icard, around 1,194 feet up, has mountain weather, with cold winters and summer downpours that test every slope. Most Icard customers book building demolition for late spring and early fall. December through February bring freezing conditions that make hillside work unsafe.

Burke County remembers its storms. The flooding and landslides of Hurricane Helene in late September 2024 left damaged structures across the mountains that are still coming down.

What building demolition costs in Icard

What is specific to pricing building demolition in Icard:

  • Icard home values. The typical Icard home is valued near $137,000, a useful yardstick when deciding whether building demolition pays off at sale or rebuild.

Map of our Icard building demolition area

Book building demolition in Icard

ICARD · BURKE COUNTY

Need building demolition in Icard?

One call or message gets a free Icard site visit and a price with every line spelled out.

LIVE · NATIONAL WEATHER SERVICE

Building Demolition weather outlook for Icard this week

How the next seven days in Icard, Burke County affect building demolition, from the official National Weather Service forecast.

Loading the latest forecast for Icard…

READY TO CLEAR THE SITE?

Tell us about your building demolition project in Icard.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Building Demolition in Icard: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Is a permit required for building demolition in Icard?

The Burke County inspections office issues demolition permits for Icard addresses.

When is the best time of year for building demolition in Icard?

Usually late spring and early fall, with mild temperatures and dependable ground before summer storms or winter freezes. December through February are the hardest in Icard, with freezing conditions that make hillside work unsafe.

Where does the debris from Icard jobs go?

Mixed demolition debris from Icard can go to Burke County Johns River Waste Management in Morganton, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 11 miles off. Inert debris such as concrete and brick can also go to Little Mountain Construction LCID in Maiden, a permitted LCID landfill roughly 24 miles from Icard.

Are older homes in Icard likely to contain asbestos?

Census estimates put the median Icard home at 1981, with 49% built before 1980 and 8% before 1940. Asbestos was common in homes of that era, so many Icard jobs need testing under the state Health Hazards Control Unit's rules before work starts.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp