About our civil demolition work in Brices Creek
Jacksonville is 28 miles from Brices Creek, and we cover both.
Our civil demolition page explains the work in general; below is what changes in Brices Creek.
QUICK ANSWERS
- Civil Demolition permit
- Required; we file it with the county
- Region
- Coastal Plain
- Owner-occupied homes
- 91%
- Elevation
- About 26 ft
- Main soil
- Pantego (very poorly drained)
Brices Creek housing and what it means for civil demolition
Brices Creek’s homes are 100% detached houses. Most Brices Creek civil demolition jobs are on private single-family lots (American Community Survey).
Homeowners own 91% of occupied homes in Brices Creek (statewide: 66%), and they make up most of our civil demolition work there.
Who needs civil demolition in Brices Creek
Brices Creek is an unincorporated community of about 3,700 people in Craven County, so county rules generally apply rather than a town’s.
In Brices Creek, civil demolition is usually about redevelopment of older industrial, civil and specialty structures.
Brices Creek ground conditions and civil demolition
Pantego is the soil you are most likely to dig into in Brices Creek, per the USDA soil survey (4 of nine sampled points). It is very poorly drained and moderately fast-draining (hydrologic group B/D, when drained), on mapped slopes of 0–2%. The seasonal water table can rise to about 1 foot below the surface.
A water table near 1 foot means civil demolition in Brices Creek is easiest in dry weather, with dewatering ready for a wet spell.
Brices Creek and nearby towns for civil demolition
About 28 miles from Jacksonville, Brices Creek is part of our Craven County service area for civil demolition.
At roughly 26 feet of elevation, Brices Creek has its own character; see Brices Creek on Wikipedia.
Brices Creek residents can find ordinances and permit contacts on the Craven County website.
Close to Brices Creek, the same civil demolition service covers Trent Woods, New Bern, River Bend and James City.
Civil Demolition near Brices Creek landmarks
- Coastal Carolina Regional Airport (about 3 mi from Brices Creek). With visitors heading to Coastal Carolina Regional Airport, we keep trucks off the busiest roads and times while civil demolition is underway.
- Dr. Earl S. Sloan House (about 3 mi from Brices Creek). The streets near Dr. Earl S. Sloan House are part of our Brices Creek service area for civil demolition.
- Wilson Creek (about 3 mi from Brices Creek). Sites that drain toward Wilson Creek need silt fence and inlet protection so soil stays out of the water during civil demolition.
Permitted disposal sites for civil demolition near Brices Creek
Mixed demolition debris from Brices Creek can go to The Maysville Construction and Demolition Landfill, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 12 miles off. Clean concrete, brick and stumps have a closer option at Craven LCID Landfill in New Bern, an LCID landfill about 10 miles away.
Permits and rules for civil demolition in Brices Creek
Specialty work in Brices Creek starts with a permit from the Craven County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Brices Creek is usually permitted by Craven County; we check for any town jurisdiction first, then file. Asbestos rules for Brices Creek are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Erosion and sediment control, EPA: Construction stormwater and EPA: Wetlands on every Brices Creek job. Craven County is one of North Carolina's coastal counties, so work near water in Brices Creek may need a permit from the NC Division of Coastal Management. Flood maps for Brices Creek are on the NC Flood Risk Information System.
Best time for civil demolition in Brices Creek
Brices Creek, around 26 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. For civil demolition in Brices Creek, aim for November through April: milder weather and firmer ground once the storm season eases. Avoid August and September if you can, given peak hurricane season, heavy heat and saturated ground that stop work.
For Brices Creek, the regional storm record includes this: record rain from Hurricane Florence in 2018 flooded much of southeastern North Carolina, and many homes were demolished in the recovery.
Pricing civil demolition in Brices Creek
Beyond size, materials and access, these Brices Creek factors affect the price:
- Coastal permitting. Floodplain or CAMA steps can apply in Craven County.
Civil Demolition near Brices Creek: map
Get a free civil demolition quote in Brices Creek
BRICES CREEK · CRAVEN COUNTY
Need civil demolition in Brices Creek?
Get a fixed civil demolition price for your Brices Creek property after a free visit.