CAMDEN · CAMDEN COUNTY · NC

Concrete Removal in Camden, NC

Planning concrete removal in Camden? We handle the permits, the work and the haul-off for a fixed, itemized price.

Service areaCamden & Camden County
PopulationAbout 960
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free concrete removal quote in Camden

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

Camden concrete removal, start to finish

Our Coastal Plain crews cover Camden.

The general process is on the concrete removal page; this page is about doing it well in Camden.

QUICK ANSWERS

Concrete Removal permit
Usually not needed; we confirm for your address
County
Camden County
Region
Coastal Plain
Owner-occupied homes
46%
Elevation
About 10 ft

Camden housing and what it means for concrete removal

Census survey figures date the median Camden home to 1997 (close to the Camden County median of 1999); 18% of the 460 homes are older than 1980. For concrete removal, that means Camden homeowners usually remove concrete to redesign, not because it failed.

Housing in Camden breaks down as 32% detached houses, 34% apartments and condos, 34% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes concrete removal around Camden.

What drives concrete removal in Camden

Camden is an unincorporated community of about 960 people in Camden County, so county rules generally apply rather than a town’s.

Most concrete removal requests here come from aging driveways, slabs and walls being replaced as homes are updated.

What Camden’s soil means for concrete removal

Camden’s soils are mixed: across nine sample points the USDA soil survey maps Perquimans most often, mostly moderately well drained and slow to absorb rain (hydrologic group C/D, when drained), on mapped slopes of 0–3%.

Because Camden’s soil absorbs rain slowly, bare ground after concrete removal is graded to drain and stabilized quickly.

Concrete Removal around Camden and Camden County

Camden is part of our Camden County service area for concrete removal.

Some background: elevation near 10 feet (Camden on Wikipedia).

Check the Camden County website for Camden’s current fees and permit desks.

Elizabeth City, South Mills, Moyock and Coinjock are a short drive from Camden and on our concrete removal schedule too.

Camden places that shape our concrete removal work

  • Camden County Jail (about 1 mi from Camden). Properties in the neighborhoods around Camden County Jail are covered by our Camden concrete removal service, with access and parking checked at the site visit.

Permitted disposal sites for concrete removal near Camden

Mixed demolition debris from Camden can go to Soundside C&D Waste Transfer & Recycling Center in Jarvisburg, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 20 miles off.

Camden rules that apply to concrete removal

Most Camden concrete removal needs no demolition permit; work touching the street, a curb cut or a state road is the exception and may need Camden County or NCDOT approval.

OSHA: Respirable crystalline silica, EPA: Construction and demolition materials and EPA: Sustainable materials management set the standards we work to in Camden. Camden County is one of North Carolina's coastal counties, so work near water in Camden may need a permit from the NC Division of Coastal Management. Flood maps for Camden are on the NC Flood Risk Information System.

Best time for concrete removal in Camden

Camden, around 10 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. For concrete removal in Camden, aim for November through April: comfortable temperatures and the end of the wettest stretch. Avoid August and September if you can, given the height of storm season, when heat and flooding halt work.

Storm history matters in Camden County: storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes.

Pricing concrete removal in Camden

On top of the usual factors, a Camden quote reflects:

  • Local property values. With a median home value near $360,000 in Camden, owners usually weigh the project against resale value, so we keep every line of the quote visible.
  • Haul distance. With roughly 20 miles to the closest permitted site, fuller, fewer loads keep Camden haul costs down.
  • Floodplain steps. Floodplain or CAMA steps can apply in Camden County.

Map of our Camden concrete removal area

Book concrete removal in Camden

CAMDEN · CAMDEN COUNTY

Need concrete removal in Camden?

Tell us about the Camden property and we will set up a free visit.

LIVE · NATIONAL WEATHER SERVICE

Concrete Removal weather outlook for Camden this week

How the next seven days in Camden, Camden County affect concrete removal, from the official National Weather Service forecast.

Loading the latest forecast for Camden…

READY TO CLEAR THE SITE?

Tell us about your concrete removal project in Camden.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Concrete Removal in Camden: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Who issues permits for concrete removal in Camden?

Most Camden concrete removal needs no demolition permit; work touching the street, a curb cut or a state road is the exception and may need Camden County or NCDOT approval.

What will we dig into in Camden?

The USDA soil survey shows mostly Perquimans soils, moderately well drained and a seasonal water table that can rise to about 1 foot.

Where does the debris from Camden jobs go?

Mixed demolition debris from Camden can go to Soundside C&D Waste Transfer & Recycling Center in Jarvisburg, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 20 miles off.

Which season suits concrete removal in Camden best?

In Camden, at about 10 feet, November through April tends to work best because of comfortable temperatures and the end of the wettest stretch; August and September bring the height of storm season, when heat and flooding halt work.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp