HASSELL · MARTIN COUNTY · NC

Home Demolition in Hassell, NC

Planning home demolition in Hassell? We handle the permits, the work and the haul-off for a fixed, itemized price.

Service areaHassell & Martin County
PopulationAbout 47 (2024 est.)
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free home demolition quote in Hassell

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

Home Demolition services in Hassell, NC

Greenville is 22 miles from Hassell, and we cover both.

The general process is on the home demolition page; this page is about doing it well in Hassell.

QUICK ANSWERS

Home Demolition permit
Required; we file it with the Town of Hassell or county
Population
About 47 (2024 est.)
Region
Coastal Plain
Elevation
About 79 ft
Main soil
Rains (poorly drained)

What Hassell’s homes tell us about home demolition

Census survey figures date the median Hassell home to 1995 (newer than the Martin County median of 1976); 36% of the 36 homes are older than 1980. For home demolition, that means many Hassell teardowns start with an asbestos and lead survey.

25% of Hassell homes are vacant, above the state’s 13%, and empty, deteriorating houses are a common reason for home demolition.

What drives home demolition in Hassell

Hassell had 48 residents at the 2020 baseline, and the U.S. Census Bureau estimates 47 by July 2024, a decline of about 2.1%.

In a settled town like Hassell, most home demolition calls come from older buildings reaching the end of their life and lots being cleared for new construction.

Hassell ground conditions and home demolition

The USDA soil survey maps Rains soils at 5 of nine points we checked across Hassell. They are poorly drained and moderately fast-draining (hydrologic group B/D, when drained), on mapped slopes of 0–15%. The seasonal water table can rise to about 1 foot below the surface and the survey rates the ground “very limited” for homes with basements.

For owners planning to rebuild with a basement, the “very limited” rating means drainage deserves attention from the start. A water table near 1 foot means home demolition in Hassell is easiest in dry weather, with dewatering ready for a wet spell.

Hassell and nearby towns for home demolition

Hassell is a Martin County community in North Carolina’s Coastal Plain, about 22 miles from Greenville.

Some background: elevation near 79 feet (Hassell on Wikipedia).

For local ordinances and permit contacts, see the Martin County website.

Home Demolition is also available in Everetts, Williamston, Bear Grass and Jamesville, all in Martin County.

Oak City, Hamilton, Robersonville and Parmele are a short drive from Hassell and on our home demolition schedule too.

Home Demolition near Hassell landmarks

  • Conoho Creek Historic District (about 2 mi from Hassell). Work close to Conoho Creek Historic District has to respect historic character. If a property sits inside a local historic district, home demolition may need a Certificate of Appropriateness before anything is removed.

Permitted disposal sites for home demolition near Hassell

Mixed demolition debris from Hassell can go to Edgecombe County CDLF in Tarboro, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 17 miles off. Inert debris such as concrete and brick can also go to Barnhill Contracting LCID Landfill in Rocky Mount, a permitted LCID landfill roughly 27 miles from Hassell.

Hassell rules that apply to home demolition

The Town of Hassell or the Martin County inspections office issues demolition permits for Hassell addresses. We confirm whether the Town of Hassell or Martin County handles your Hassell address, then file the permit there. Asbestos rules for Hassell are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.

Agencies whose rules apply to this work in Martin County: EPA: Asbestos NESHAP, OSHA: Demolition safety and EPA: Lead Renovation, Repair and Painting. Flood maps for Hassell are on the NC Flood Risk Information System.

Best time for home demolition in Hassell

Hassell, around 79 feet up, has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for home demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.

Storm history matters in Martin County: hurricane Floyd in September 1999 caused record flooding across the Tar and Neuse river basins, and the buyouts that followed meant many flooded homes were demolished.

What home demolition costs in Hassell

Beyond size, materials and access, these Hassell factors affect the price:

  • Coastal permitting. Floodplain or CAMA steps can apply in Martin County.

Map of our Hassell home demolition area

Book home demolition in Hassell

HASSELL · MARTIN COUNTY

Need home demolition in Hassell?

Tell us about the Hassell property and we will set up a free visit.

LIVE · NATIONAL WEATHER SERVICE

Home Demolition weather outlook for Hassell this week

How the next seven days in Hassell, Martin County affect home demolition, from the official National Weather Service forecast.

Loading the latest forecast for Hassell…

READY TO CLEAR THE SITE?

Tell us about your home demolition project in Hassell.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Home Demolition in Hassell: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Is a permit required for home demolition in Hassell?

The Town of Hassell or the Martin County inspections office issues demolition permits for Hassell addresses.

Do you work near Conoho Creek Historic District in Hassell?

Yes. Jobs near Conoho Creek Historic District are part of our Hassell work, with extra care for access and neighbors.

Where can I check Hassell permit rules myself?

The Martin County website publishes local ordinances and permit contacts.

Which season suits home demolition in Hassell best?

In Hassell, at about 79 feet, November through April tends to work best because of comfortable temperatures and the end of the wettest stretch; August and September bring storm threats and waterlogged lots that push jobs back.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp