About our hydro demolition work in Butner
Butner is about 14 miles from Durham, and our crews work across the area.
The general process is on the hydro demolition page; this page is about doing it well in Butner.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Butner or county
- Typical home built
- 1990 (30% before 1980)
- Median home value
- $226,000
- Best months
- October and November
- County
- Granville County
Butner housing and what it means for hydro demolition
Butner’s homes are 56% detached houses, 14% apartments and condos, 23% mobile homes. With mobile homes this common, hydro demolition in Butner regularly includes older units and their pads (American Community Survey).
Homeowners own 72% of occupied homes in Butner (statewide: 66%), and they make up most of our hydro demolition work there.
What drives hydro demolition in Butner
From 7,954 people in 2020, Butner reached about 8,134 by mid-2024 according to the U.S. Census Bureau, steady growth of 2.3%.
Redevelopment of older industrial, civil and specialty structures: that is where most Butner hydro demolition calls come from.
Butner and nearby towns for hydro demolition
Ground in Butner means clay soil that hardens dry and turns to mud wet, typical of the Piedmont; we plan hydro demolition around it, as we do across the Durham area.
Some background: elevation near 371 feet (Butner on Wikipedia).
Butner residents can find ordinances and permit contacts on the Town of Butner website and the Granville County website.
Creedmoor, Stem, Gorman and Rougemont are a short drive from Butner and on our hydro demolition schedule too.
Landmarks around Butner and hydro demolition
- Cozart-Coley House (about 4 mi from Butner). Properties in the neighborhoods around Cozart-Coley House are covered by our Butner hydro demolition service, with access and parking checked at the site visit.
- Cedar Creek Gallery (about 4 mi from Butner). Near Cedar Creek Gallery, we protect runoff and tree root zones from day one of hydro demolition, keeping sediment out of streams and green space.
- Museum of American Pottery (about 4 mi from Butner). With visitors heading to Museum of American Pottery, we keep trucks off the busiest roads and times while hydro demolition is underway.
Permitted disposal sites for hydro demolition near Butner
Mixed demolition debris from Butner can go to Durant Road Transfer Station in Raleigh, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 19 miles off. Clean concrete, brick and stumps have a closer option at Carolina Tree Debris in Raleigh, an LCID landfill about 23 miles away.
Butner rules that apply to hydro demolition
Specialty work in Butner starts with a permit from the Town of Butner or the Granville County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Butner or Granville County’s inspections office, whichever covers your address. For Butner properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Butner job.
Best time for hydro demolition in Butner
Butner, around 371 feet up, has Piedmont weather: steamy summers, pop-up storms and occasional winter ice. October and November is usually the best window for hydro demolition here, with firm ground and comfortable working days; July and August are the hardest months.
Storm history matters in Granville County: hurricane Fran’s 1996 winds toppled trees onto houses throughout the Triangle.
Hydro Demolition near Butner: map
Get a free hydro demolition quote in Butner
BUTNER · GRANVILLE COUNTY
Need hydro demolition in Butner?
Tell us about the Butner property and we will set up a free visit.