Butters hydro demolition, start to finish
Butters is about 36 miles from Fayetteville, and our crews work across the area.
For the full scope of the service, see our hydro demolition page. Here we focus on Butters: its housing, rules, ground and weather.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Typical home built
- 1957 (62% before 1980)
- Elevation
- About 112 ft
- Main soil
- Norfolk (well drained)
- County
- Bladen County
Hydro Demolition and the Butters housing stock
Housing in Butters breaks down as 100% detached houses. Detached homes dominate, so most hydro demolition in Butters is done for individual owners on their own lots (American Community Survey).
Vacancy is low at 0%, so most hydro demolition in Butters happens on occupied properties next to active neighbors.
Butters at a glance for hydro demolition
Butters is an unincorporated community of about 160 people in Bladen County, so county rules generally apply rather than a town’s.
Redevelopment of older industrial, civil and specialty structures drive most hydro demolition calls from Butters.
Hydro Demolition around Butters and Bladen County
36 miles from Fayetteville, Butters is a Bladen County community with loose sand with groundwater close to the surface, which shapes staging and site protection.
According to Butters on Wikipedia, Butters is a long-standing community and stands about 112 feet up.
Check the Bladen County website for Butters’ current fees and permit desks.
Neighbors of Butters we serve: Bladenboro, Dublin, Lumberton and Boardman.
Where debris from hydro demolition in Butters goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Robeson County CDLF in Saint Pauls, about 16 miles from Butters. Inert debris such as concrete and brick can also go to Columbus County Landfill in Whiteville, a permitted LCID landfill roughly 20 miles from Butters.
Hydro Demolition permits and regulations in Butters
Large and specialty demolition in Butters needs a demolition permit from the Bladen County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Bladen County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Butters are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program set the standards we work to in Butters. Flood maps for Butters are on the NC Flood Risk Information System.
When to book hydro demolition in Butters
At about 112 feet above sea level, Butters has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. Most Butters customers book hydro demolition for November through April. August and September bring the height of storm season, when heat and flooding halt work.
Hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward, a reminder for property owners across Bladen County of how storms create demolition and clean-up work.
Pricing hydro demolition in Butters
What is specific to pricing hydro demolition in Butters:
- Coastal permitting. Low Butters lots may need flood or coastal approvals first.
Map of our Butters hydro demolition area
Book hydro demolition in Butters
BUTTERS · BLADEN COUNTY
Need hydro demolition in Butters?
Send your Butters address for a free site visit and a fixed, itemized quote.