Davis hydro demolition, start to finish
Davis lies in North Carolina’s Coastal Plain.
Everything the service includes is set out on our main hydro demolition page; this page covers what is specific to Davis.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Main soil
- Hobucken (very poorly drained)
- County
- Carteret County
- Region
- Coastal Plain
- Owner-occupied homes
- 94%
What Davis’ homes tell us about hydro demolition
Housing in Davis breaks down as 86% detached houses, 14% mobile homes. Most Davis hydro demolition jobs are on private single-family lots (American Community Survey).
With 19% of homes empty, Davis sees hydro demolition on abandoned and unsafe properties regularly.
Davis’ growth and demand for hydro demolition
With no town government, Davis (about 280 residents) falls under Carteret County for permits and ordinances.
Most hydro demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Where we provide hydro demolition near Davis
Davis sits in Carteret County, in the Coastal Plain, where the ground is loose sand with groundwater close to the surface. That affects how we stage equipment and protect the site.
Check the Carteret County website for Davis’ current fees and permit desks.
We also provide hydro demolition in Marshallberg, Gloucester, Harkers Island and Atlantic.
Davis landfills and transfer stations for hydro demolition
For Davis, the closest permitted construction and demolition transfer station is Green Recycling Transfer Station at Hibbs Road in Newport (Carteret County), roughly 23 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Cieszko LCID in Havelock, a permitted LCID landfill roughly 22 miles from Davis.
Permits and rules for hydro demolition in Davis
Large and specialty demolition in Davis needs a demolition permit from the Carteret County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Carteret County’s inspections office, or a nearby town if the lot is in its jurisdiction. 83% of Davis’ homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program set the standards we work to in Davis. Carteret County is one of North Carolina's coastal counties, so work near water in Davis may need a permit from the NC Division of Coastal Management. Flood maps for Davis are on the NC Flood Risk Information System.
Davis weather and hydro demolition scheduling
Davis is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for hydro demolition here, with cooler days, drier ground and hurricane season winding down or over; August and September are the hardest months.
Carteret County remembers its storms. Record rain from Hurricane Florence in 2018 flooded much of southeastern North Carolina, and many homes were demolished in the recovery.
Davis hydro demolition pricing factors
Beyond size, materials and access, these Davis factors affect the price:
- Haul distance. The nearest permitted facility for this debris is about 23 miles from Davis, so trucking time is part of the price.
- Coastal permitting. Floodplain or CAMA steps can apply in Carteret County.
Map of our Davis hydro demolition area
Book hydro demolition in Davis
DAVIS · CARTERET COUNTY
Need hydro demolition in Davis?
One call or message gets a free Davis site visit and a price with every line spelled out.