Hydro Demolition services in Long Creek, NC
Wilmington is 17 miles from Long Creek, and we cover both.
Our hydro demolition page explains the work in general; below is what changes in Long Creek.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Typical home built
- 1968 (69% before 1980)
- Elevation
- About 20 ft
- Main soil
- Lumbee (poorly drained)
- County
- Pender County
What Long Creek’s homes tell us about hydro demolition
In Long Creek, the housing stock is 66% detached houses, 34% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in hydro demolition (American Community Survey).
Seasonal homes make 54% of Long Creek’s housing vacant at a given time, so off-season hydro demolition is common.
Who needs hydro demolition in Long Creek
With no town government, Long Creek (about 80 residents) falls under Pender County for permits and ordinances.
In Long Creek, hydro demolition is usually about redevelopment of older industrial, civil and specialty structures.
Long Creek and nearby towns for hydro demolition
In Pender County’s part of the Coastal Plain, Long Creek has low-lying sandy soil over a shallow water table, and Wilmington is 17 miles away; our hydro demolition plan starts from that.
At roughly 20 feet of elevation, Long Creek has its own character; see Long Creek on Wikipedia.
For local ordinances and permit contacts, see the Pender County website.
Close to Long Creek, the same hydro demolition service covers Rocky Point, St. Helena, Castle Hayne and Skippers Corner.
Long Creek landfills and transfer stations for hydro demolition
For Long Creek, the closest permitted construction and demolition landfill is Delco Transfer and Recycling LLC (Former Big D T&P) (Columbus County), roughly 13 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Duplin County LCID Landfill in Rose Hill, a permitted LCID landfill roughly 30 miles from Long Creek.
Permits and rules for hydro demolition in Long Creek
Specialty work in Long Creek starts with a permit from the Pender County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Long Creek is usually permitted by Pender County; we check for any town jurisdiction first, then file. 69% of Long Creek’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
Agencies whose rules apply to this work in Pender County: OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program. Pender County is one of North Carolina's coastal counties, so work near water in Long Creek may need a permit from the NC Division of Coastal Management. Flood maps for Long Creek are on the NC Flood Risk Information System.
Long Creek weather and hydro demolition scheduling
Sitting near 20 feet, Long Creek is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for hydro demolition here, with milder weather and firmer ground once the storm season eases; August and September are the hardest months.
For Long Creek, the regional storm record includes this: hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward.
Long Creek hydro demolition pricing factors
Beyond size, materials and access, these Long Creek factors affect the price:
- Floodplain steps. Floodplain or CAMA steps can apply in Pender County.
Map of our Long Creek hydro demolition area
Book hydro demolition in Long Creek
LONG CREEK · PENDER COUNTY
Need hydro demolition in Long Creek?
Get a fixed hydro demolition price for your Long Creek property after a free visit.