About our hydro demolition work in Macclesfield
Rocky Mount is 17 miles from Macclesfield, and we cover both.
For the full scope of the service, see our hydro demolition page. Here we focus on Macclesfield: its housing, rules, ground and weather.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Macclesfield or county
- Typical home built
- 1958 (70% before 1980)
- Median home value
- $116,000
- Best months
- November through April
- County
- Edgecombe County
Hydro Demolition and the Macclesfield housing stock
Macclesfield’s homes are 77% detached houses, 14% mobile homes. Detached homes dominate, so most hydro demolition in Macclesfield is done for individual owners on their own lots (American Community Survey).
New construction is a modest part of Macclesfield: 7% of homes date from 2010 or later, so hydro demolition demand follows redevelopment of existing lots.
Macclesfield at a glance for hydro demolition
Macclesfield had 412 residents at the 2020 baseline, and the U.S. Census Bureau estimates 407 by July 2024, a roughly stable population.
Here, demand for hydro demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
Macclesfield and nearby towns for hydro demolition
17 miles from Rocky Mount, Macclesfield is a Edgecombe County community with flat, sandy ground that holds water after storms, which shapes staging and site protection.
According to Macclesfield on Wikipedia, Macclesfield is a long-standing community and stands about 95 feet up.
Macclesfield residents can find ordinances and permit contacts on the Edgecombe County website.
Neighbors of Macclesfield we serve: Pinetops, Fountain, Saratoga and Falkland.
Where debris from hydro demolition in Macclesfield goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Edgecombe County CDLF in Tarboro, about 7 miles from Macclesfield. Clean concrete, brick and stumps have a closer option at Barnhill Contracting LCID Landfill in Rocky Mount, an LCID landfill about 17 miles away.
Permits and rules for hydro demolition in Macclesfield
Large and specialty demolition in Macclesfield needs a demolition permit from the Town of Macclesfield or the Edgecombe County inspections office, and often engineering review and specialist permits too. The Town of Macclesfield or Edgecombe County inspections office issues the permit, and we handle the application for your Macclesfield property. Asbestos rules for Macclesfield are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Macclesfield job. Flood maps for Macclesfield are on the NC Flood Risk Information System.
When to book hydro demolition in Macclesfield
At about 95 feet above sea level, Macclesfield has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. Most Macclesfield customers book hydro demolition for November through April. August and September bring peak hurricane season, heavy heat and saturated ground that stop work.
Hurricane Floyd’s 1999 floods along the Tar and Neuse rivers led to buyouts and the demolition of many flooded homes, a reminder for property owners across Edgecombe County of how storms create demolition and clean-up work.
Pricing hydro demolition in Macclesfield
What is specific to pricing hydro demolition in Macclesfield:
- Flood and coastal rules. Low Macclesfield lots may need flood or coastal approvals first.
Hydro Demolition near Macclesfield: map
Get a free hydro demolition quote in Macclesfield
MACCLESFIELD · EDGECOMBE COUNTY
Need hydro demolition in Macclesfield?
Send your Macclesfield address for a free site visit and a fixed, itemized quote.