About our hydro demolition work in Manns Harbor
Manns Harbor is part of our Coastal Plain service area.
Everything the service includes is set out on our main hydro demolition page; this page covers what is specific to Manns Harbor.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Owner-occupied homes
- 59%
- Elevation
- About 7 ft
- Main soil
- Pungo (very poorly drained)
- County
- Dare County
What Manns Harbor’s homes tell us about hydro demolition
Manns Harbor’s homes are 46% detached houses, 54% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes hydro demolition around Manns Harbor.
Of Manns Harbor’s roughly 546 homes, 21% were built before 1980 and the median dates from 1985, close to the Dare County median of 1987 (American Community Survey). In practice, heavy demolition near Manns Harbor tends to involve older commercial and industrial sites rather than homes.
Manns Harbor’s growth and demand for hydro demolition
About 670 people live in unincorporated Manns Harbor, where Dare County sets most of the rules.
Most hydro demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Manns Harbor and nearby towns for hydro demolition
Manns Harbor sits in Dare County, in the Coastal Plain, where the ground is flat, sandy ground that holds water after storms. That affects how we stage equipment and protect the site.
Manns Harbor sits about 7 feet above sea level (Manns Harbor on Wikipedia).
Manns Harbor residents can find ordinances and permit contacts on the Dare County website.
We also provide hydro demolition in Manteo, Wanchese, Nags Head and Kill Devil Hills.
Manns Harbor places that shape our hydro demolition work
- William B. Umstead Bridge (about 2 mi from Manns Harbor). Properties in the neighborhoods around William B. Umstead Bridge are covered by our Manns Harbor hydro demolition service, with access and parking checked at the site visit.
Manns Harbor landfills and transfer stations for hydro demolition
For Manns Harbor, the closest permitted construction and demolition transfer station is Bay Disposal, LLC in Powells Point (Currituck County), roughly 15 miles away, per the NC DEQ Solid Waste Section.
Permits and rules for hydro demolition in Manns Harbor
Large and specialty demolition in Manns Harbor needs a demolition permit from the Dare County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Dare County’s inspections office, or a nearby town if the lot is in its jurisdiction. 21% of Manns Harbor’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Manns Harbor job. Dare County is one of North Carolina's coastal counties, so work near water in Manns Harbor may need a permit from the NC Division of Coastal Management. Flood maps for Manns Harbor are on the NC Flood Risk Information System.
Manns Harbor weather and hydro demolition scheduling
Sitting near 7 feet, Manns Harbor is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for hydro demolition here, with cooler days, drier ground and hurricane season winding down or over; August and September are the hardest months.
Dare County remembers its storms. Hurricane Isabel in September 2003 pushed storm surge across the Outer Banks and the northeastern sounds, damaging thousands of homes.
Manns Harbor hydro demolition pricing factors
Beyond size, materials and access, these Manns Harbor factors affect the price:
- Flood and coastal rules. Floodplain or CAMA steps can apply in Dare County.
Hydro Demolition near Manns Harbor: map
Get a free hydro demolition quote in Manns Harbor
MANNS HARBOR · DARE COUNTY
Need hydro demolition in Manns Harbor?
One call or message gets a free Manns Harbor site visit and a price with every line spelled out.