Hydro Demolition in Micro
With 15.2% growth since 2020, Micro is outpacing the state.
The general process is on the hydro demolition page; this page is about doing it well in Micro.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Micro or county
- Typical home built
- 1984 (38% before 1980)
- Median home value
- $213,000
- Best months
- November through April
- County
- Johnston County
Micro housing and what it means for hydro demolition
By building type, Micro is 48% detached houses, 17% mobile homes. That mix means hydro demolition in Micro ranges from single homes to larger residential buildings (American Community Survey).
53% of occupied Micro homes are owner-occupied, below the state’s 66%, so hydro demolition comes from both homeowners and landlords.
What drives hydro demolition in Micro
From 460 people in 2020, Micro reached about 530 by mid-2024 according to the U.S. Census Bureau, growth of 15.2%, ahead of the statewide 5.8%.
Redevelopment of older industrial, civil and specialty structures: that is where most Micro hydro demolition calls come from.
Micro and nearby towns for hydro demolition
Ground in Micro means sandy soil and a high water table, typical of the Coastal Plain; we plan hydro demolition around it, as we do across the Raleigh area.
Some background: elevation near 187 feet (Micro on Wikipedia).
Local permit offices, fee schedules and notices are published on the Johnston County website.
Hydro Demolition is also available in Smithfield and Clayton, all in Johnston County.
Pine Level, Kenly, Selma and Princeton are a short drive from Micro and on our hydro demolition schedule too.
Permitted disposal sites for hydro demolition near Micro
Mixed demolition debris from Micro can go to Shotwell Landfill, Inc in Wendell, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 17 miles off. Clean concrete, brick and stumps have a closer option at Carolina Tree Debris in Raleigh, an LCID landfill about 27 miles away.
Micro rules that apply to hydro demolition
Specialty work in Micro starts with a permit from the Town of Micro or the Johnston County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Micro or Johnston County’s inspections office, whichever covers your address. For Micro properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
For hydro demolition in Micro, the rules come from OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program. Flood maps for Micro are on the NC Flood Risk Information System.
Best time for hydro demolition in Micro
Micro, around 187 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. For hydro demolition in Micro, aim for November through April: comfortable temperatures and the end of the wettest stretch. Avoid August and September if you can, given tropical weather and soaked ground that make sites unworkable.
Storm history matters in Johnston County: hurricane Fran in September 1996 carried hurricane-force winds inland to the Triangle, toppling trees onto homes across the region.
What hydro demolition costs in Micro
On top of the usual factors, a Micro quote reflects:
- Floodplain steps. Johnston County coastal and flood rules can add paperwork.
Hydro Demolition near Micro: map
Get a free hydro demolition quote in Micro
MICRO · JOHNSTON COUNTY
Need hydro demolition in Micro?
Tell us about the Micro property and we will set up a free visit.