Hydro Demolition services in New Hope, NC
Our hydro demolition crews reach New Hope as part of the wider Greenville area, 33 miles away.
For the full scope of the service, see our hydro demolition page. Here we focus on New Hope: its housing, rules, ground and weather.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Population
- About 920
- Region
- Coastal Plain
- Owner-occupied homes
- 70%
- Elevation
- About 131 ft
Hydro Demolition and the New Hope housing stock
In New Hope, the housing stock is 95% detached houses, 5% apartments and condos. Detached homes dominate, so most hydro demolition in New Hope is done for individual owners on their own lots (American Community Survey).
With 18% of homes empty, New Hope sees hydro demolition on abandoned and unsafe properties regularly.
New Hope at a glance for hydro demolition
With no town government, New Hope (about 920 residents) falls under Wayne County for permits and ordinances.
Most hydro demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Where we provide hydro demolition near New Hope
33 miles from Greenville, New Hope is a Wayne County community with low-lying sandy soil over a shallow water table, which shapes staging and site protection.
According to New Hope on Wikipedia, New Hope is a long-standing community and stands about 131 feet up.
For local ordinances and permit contacts, see the Wayne County website.
Neighbors of New Hope we serve: Elroy, Goldsboro, Walnut Creek and La Grange.
Where debris from hydro demolition in New Hope goes
Mixed demolition debris from New Hope can go to Lenoir County CDLF in LaGrange, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 12 miles off. Inert debris such as concrete and brick can also go to Everett's LCID Pit in Kinston, a permitted LCID landfill roughly 10 miles from New Hope.
Permits and rules for hydro demolition in New Hope
Large and specialty demolition in New Hope needs a demolition permit from the Wayne County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Wayne County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for New Hope are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
Agencies whose rules apply to this work in Wayne County: OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program. Flood maps for New Hope are on the NC Flood Risk Information System.
When to book hydro demolition in New Hope
At about 131 feet above sea level, New Hope has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for hydro demolition here, with fewer tropical systems and less standing water; August and September are the hardest months.
The Tar and Neuse basins flooded to record levels during Hurricane Floyd in 1999, and buyouts afterward led to many homes being torn down, a reminder for property owners across Wayne County of how storms create demolition and clean-up work.
Pricing hydro demolition in New Hope
What is specific to pricing hydro demolition in New Hope:
- Flood and coastal rules. Low New Hope lots may need flood or coastal approvals first.
Map of our New Hope hydro demolition area
Book hydro demolition in New Hope
NEW HOPE · WAYNE COUNTY
Need hydro demolition in New Hope?
Send your New Hope address for a free site visit and a fixed, itemized quote.