Hydro Demolition services in New London, NC
New London is about 24 miles from Concord, and our crews work across the area.
The general process is on the hydro demolition page; this page is about doing it well in New London.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of New London or county
- Typical home built
- 1970 (77% before 1980)
- Median home value
- $256,000
- Best months
- October and November
- County
- Stanly County
New London housing and what it means for hydro demolition
In New London, the housing stock is 95% detached houses, 6% mobile homes. In a town of single-family lots like New London, hydro demolition usually happens with a driveway and yard to protect (American Community Survey).
With 10% of housing built after 2010, New London is mostly built out, and hydro demolition work reflects that.
What drives hydro demolition in New London
From 609 people in 2020, New London reached about 648 by mid-2024 according to the U.S. Census Bureau, steady growth of 6.4%.
Redevelopment of older industrial, civil and specialty structures: that is where most New London hydro demolition calls come from.
Hydro Demolition around New London and Stanly County
Ground in New London means dense Piedmont clay with occasional rock, typical of the Piedmont; we plan hydro demolition around it, as we do across the Concord area.
Some background: elevation near 732 feet (New London on Wikipedia).
For local ordinances and permit contacts, see the Stanly County website.
Richfield, Misenheimer, Albemarle and Badin are a short drive from New London and on our hydro demolition schedule too.
Permitted disposal sites for hydro demolition near New London
Mixed demolition debris from New London can go to Albemarle, City of CDLF, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 10 miles off. Inert debris such as concrete and brick can also go to Tarheel Bark Company - A Division of Garick, LLC in Harrisburg, a permitted LCID landfill roughly 26 miles from New London.
New London rules that apply to hydro demolition
Specialty work in New London starts with a permit from the Town of New London or the Stanly County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of New London or Stanly County’s inspections office, whichever covers your address. For New London properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
Agencies whose rules apply to this work in Stanly County: OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program.
Best time for hydro demolition in New London
New London, around 732 feet up, sees warm, wet summers and mild winters, with ice storms a few times a decade. For hydro demolition in New London, aim for October and November: firm ground and comfortable working days. Avoid July and August if you can, given heat stress and muddy ground after thunderstorms.
Storm history matters in Stanly County: hurricane Hugo in September 1989 carried damaging winds far inland to the western Piedmont, bringing down trees across the Charlotte region.
Map of our New London hydro demolition area
Book hydro demolition in New London
NEW LONDON · STANLY COUNTY
Need hydro demolition in New London?
Tell us about the New London property and we will set up a free visit.