About our hydro demolition work in Parmele
Greenville is 16 miles from Parmele, and we cover both.
The general process is on the hydro demolition page; this page is about doing it well in Parmele.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Parmele or county
- Typical home built
- 1976 (65% before 1980)
- Median home value
- $82,000
- Best months
- November through April
- County
- Martin County
Parmele housing and what it means for hydro demolition
Parmele’s homes are 67% detached houses, 33% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in hydro demolition (American Community Survey).
With 15% of housing built after 2010, Parmele is mostly built out, and hydro demolition work reflects that.
What drives hydro demolition in Parmele
From 247 people in 2020, Parmele reached about 243 by mid-2024 according to the U.S. Census Bureau, a roughly stable population.
Redevelopment of older industrial, civil and specialty structures: that is where most Parmele hydro demolition calls come from.
Parmele and nearby towns for hydro demolition
Ground in Parmele means flat, sandy ground that holds water after storms, typical of the Coastal Plain; we plan hydro demolition around it, as we do across the Greenville area.
Some background: elevation near 75 feet (Parmele on Wikipedia).
Parmele residents can find ordinances and permit contacts on the Martin County website.
Robersonville, Bethel, Hassell and Stokes are a short drive from Parmele and on our hydro demolition schedule too.
Permitted disposal sites for hydro demolition near Parmele
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Edgecombe County CDLF in Tarboro, about 14 miles from Parmele. Clean concrete, brick and stumps have a closer option at Barnhill Contracting LCID Landfill in Rocky Mount, an LCID landfill about 27 miles away.
Permits and rules for hydro demolition in Parmele
Specialty work in Parmele starts with a permit from the Town of Parmele or the Martin County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Parmele or Martin County’s inspections office, whichever covers your address. For Parmele properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Parmele job. Flood maps for Parmele are on the NC Flood Risk Information System.
Best time for hydro demolition in Parmele
Parmele, around 75 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for hydro demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Martin County: hurricane Floyd in September 1999 caused record flooding across the Tar and Neuse river basins, and the buyouts that followed meant many flooded homes were demolished.
What hydro demolition costs in Parmele
On top of the usual factors, a Parmele quote reflects:
- Flood and coastal rules. Martin County coastal and flood rules can add paperwork.
Hydro Demolition near Parmele: map
Get a free hydro demolition quote in Parmele
PARMELE · MARTIN COUNTY
Need hydro demolition in Parmele?
Tell us about the Parmele property and we will set up a free visit.