Rex hydro demolition, start to finish
Rex is about 17 miles from Fayetteville, and our crews work across the area.
The general process is on the hydro demolition page; this page is about doing it well in Rex.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Main soil
- Norfolk (well drained)
- County
- Robeson County
- Nearest large city
- Fayetteville, about 17 miles
- Owner-occupied homes
- 100%
Rex housing and what it means for hydro demolition
Housing in Rex breaks down as 53% detached houses, 47% mobile homes. With mobile homes this common, hydro demolition in Rex regularly includes older units and their pads (American Community Survey).
Rex’s 0% vacancy rate means hydro demolition crews almost always work beside occupied homes.
What drives hydro demolition in Rex
With no town government, Rex (about 40 residents) falls under Robeson County for permits and ordinances.
Redevelopment of older industrial, civil and specialty structures drive most hydro demolition calls from Rex.
Hydro Demolition around Rex and Robeson County
Ground in Rex means loose sand with groundwater close to the surface, typical of the Coastal Plain; we plan hydro demolition around it, as we do across the Fayetteville area.
Some background: elevation near 184 feet (Rex on Wikipedia).
Check the Robeson County website for Rex’s current fees and permit desks.
Lumber Bridge, Rennert, Parkton and St. Pauls are a short drive from Rex and on our hydro demolition schedule too.
Permitted disposal sites for hydro demolition near Rex
For Rex, the closest permitted construction and demolition landfill is Robeson County CDLF in Saint Pauls (Robeson County), roughly 9 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Autry Grading, Inc., LCID Landfill in Hope Mills, a permitted LCID landfill roughly 13 miles from Rex.
Rex rules that apply to hydro demolition
Specialty work in Rex starts with a permit from the Robeson County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Rex is usually permitted by Robeson County; we check for any town jurisdiction first, then file. For Rex properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program set the standards we work to in Rex. Flood maps for Rex are on the NC Flood Risk Information System.
Best time for hydro demolition in Rex
Rex, around 184 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for hydro demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Robeson County: after Hurricane Florence’s record flooding in September 2018, flood-damaged homes across the southeast had to be removed.
What hydro demolition costs in Rex
On top of the usual factors, a Rex quote reflects:
- Coastal permitting. Robeson County coastal and flood rules can add paperwork.
Map of our Rex hydro demolition area
Book hydro demolition in Rex
REX · ROBESON COUNTY
Need hydro demolition in Rex?
Tell us about the Rex property and we will set up a free visit.