SILVER LAKE · NEW HANOVER COUNTY · NC

Hydro Demolition in Silver Lake, NC

Hydro Demolition for Silver Lake properties, priced after a free visit and carried out by one New Hanover County crew.

Service areaSilver Lake & New Hanover County
PopulationAbout 5,850
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free hydro demolition quote in Silver Lake

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

Silver Lake hydro demolition, start to finish

Silver Lake is about 5 miles from Wilmington, and our crews work across the area.

For the full scope of the service, see our hydro demolition page. Here we focus on Silver Lake: its housing, rules, ground and weather.

QUICK ANSWERS

Hydro Demolition permit
Required; we file it with the county
Typical home built
1995 (30% before 1980)
Median home value
$288,000
Best months
November through April
County
New Hanover County

Hydro Demolition and the Silver Lake housing stock

Housing in Silver Lake breaks down as 83% detached houses, 11% mobile homes. Detached homes dominate, so most hydro demolition in Silver Lake is done for individual owners on their own lots (American Community Survey).

Only 3% of Silver Lake homes stand empty, so hydro demolition here is planned around people living nearby.

Silver Lake at a glance for hydro demolition

Silver Lake is an unincorporated community of about 5,850 people in New Hanover County, so county rules generally apply rather than a town’s.

Redevelopment of older industrial, civil and specialty structures drive most hydro demolition calls from Silver Lake.

Silver Lake and nearby towns for hydro demolition

5 miles from Wilmington, Silver Lake is a New Hanover County community with loose sand with groundwater close to the surface, which shapes staging and site protection.

According to Silver Lake on Wikipedia, Silver Lake is a long-standing community and stands about 33 feet up.

Check the New Hanover County website for Silver Lake’s current fees and permit desks.

Neighbors of Silver Lake we serve: Myrtle Grove, Wilmington, Sea Breeze and Carolina Beach.

Where debris from hydro demolition in Silver Lake goes

Mixed demolition debris from Silver Lake can go to Delco Transfer and Recycling LLC (Former Big D T&P), the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 21 miles off.

Permits and rules for hydro demolition in Silver Lake

Large and specialty demolition in Silver Lake needs a demolition permit from the New Hanover County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with New Hanover County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Silver Lake are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.

OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program set the standards we work to in Silver Lake. New Hanover County is one of North Carolina's coastal counties, so work near water in Silver Lake may need a permit from the NC Division of Coastal Management. Flood maps for Silver Lake are on the NC Flood Risk Information System.

When to book hydro demolition in Silver Lake

At about 33 feet above sea level, Silver Lake has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for hydro demolition here, with fewer tropical systems and less standing water; August and September are the hardest months.

After Hurricane Florence’s record flooding in September 2018, flood-damaged homes across the southeast had to be removed, a reminder for property owners across New Hanover County of how storms create demolition and clean-up work.

Pricing hydro demolition in Silver Lake

What is specific to pricing hydro demolition in Silver Lake:

  • Haul distance. The nearest permitted facility for this debris is about 21 miles from Silver Lake, so trucking time is part of the price.
  • Coastal permitting. Low Silver Lake lots may need flood or coastal approvals first.

Map of our Silver Lake hydro demolition area

Book hydro demolition in Silver Lake

SILVER LAKE · NEW HANOVER COUNTY

Need hydro demolition in Silver Lake?

Send your Silver Lake address for a free site visit and a fixed, itemized quote.

LIVE · NATIONAL WEATHER SERVICE

Hydro Demolition weather outlook for Silver Lake this week

How the next seven days in Silver Lake, New Hanover County affect hydro demolition, from the official National Weather Service forecast.

Loading the latest forecast for Silver Lake…

READY TO CLEAR THE SITE?

Tell us about your hydro demolition project in Silver Lake.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Hydro Demolition in Silver Lake: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Who issues permits for hydro demolition in Silver Lake?

Large and specialty demolition in Silver Lake needs a demolition permit from the New Hanover County inspections office, and often engineering review and specialist permits too.

Does the season matter for hydro demolition in Silver Lake?

Usually November through April, with fewer tropical systems and less standing water. August and September are the hardest in Silver Lake, with the height of storm season, when heat and flooding halt work.

Are older homes in Silver Lake likely to contain asbestos?

Census estimates put the median Silver Lake home at 1995, with 30% built before 1980. Asbestos was common in homes of that era, so many Silver Lake jobs need testing under the state Health Hazards Control Unit's rules before work starts.

Where can I check Silver Lake permit rules myself?

The New Hanover County website publishes local ordinances and permit contacts.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp