About our hydro demolition work in Stedman
Stedman is about 16 miles from Fayetteville, and our crews work across the area.
The general process is on the hydro demolition page; this page is about doing it well in Stedman.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Stedman or county
- Typical home built
- 2003 (27% before 1980)
- Median home value
- $206,000
- Best months
- November through April
- County
- Cumberland County
Stedman housing and what it means for hydro demolition
Stedman’s homes are 96% detached houses. In a town of single-family lots like Stedman, hydro demolition usually happens with a driveway and yard to protect (American Community Survey).
Homeowners own 89% of occupied homes in Stedman (statewide: 66%), and they make up most of our hydro demolition work there.
What drives hydro demolition in Stedman
From 1,280 people in 2020, Stedman reached about 1,303 by mid-2024 according to the U.S. Census Bureau, a roughly stable population.
Redevelopment of older industrial, civil and specialty structures: that is where most Stedman hydro demolition calls come from.
Hydro Demolition around Stedman and Cumberland County
Ground in Stedman means flat, sandy ground that holds water after storms, typical of the Coastal Plain; we plan hydro demolition around it, as we do across the Fayetteville area.
Some background: incorporated or settled 1841, elevation near 125 feet (Stedman on Wikipedia).
Stedman residents can find ordinances and permit contacts on the Cumberland County website.
Hydro Demolition is also available in Hope Mills, Fayetteville and Spring Lake, all in Cumberland County.
Autryville, Vander, Eastover and Wade are a short drive from Stedman and on our hydro demolition schedule too.
Landmarks around Stedman and hydro demolition
- Maxwell House (about 1 mi from Stedman). The streets near Maxwell House are part of our Stedman service area for hydro demolition.
Permitted disposal sites for hydro demolition near Stedman
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Robeson County CDLF in Saint Pauls, about 19 miles from Stedman. Clean concrete, brick and stumps have a closer option at Autry Grading, Inc., LCID Landfill in Hope Mills, an LCID landfill about 10 miles away.
Stedman rules that apply to hydro demolition
Specialty work in Stedman starts with a permit from the Town of Stedman or the Cumberland County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Stedman or Cumberland County’s inspections office, whichever covers your address. For Stedman properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Stedman job. Flood maps for Stedman are on the NC Flood Risk Information System.
Best time for hydro demolition in Stedman
Stedman, around 125 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. For hydro demolition in Stedman, aim for November through April: comfortable temperatures and the end of the wettest stretch. Avoid August and September if you can, given peak hurricane season, heavy heat and saturated ground that stop work.
Storm history matters in Cumberland County: hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward.
What hydro demolition costs in Stedman
On top of the usual factors, a Stedman quote reflects:
- Floodplain steps. Cumberland County coastal and flood rules can add paperwork.
Hydro Demolition near Stedman: map
Get a free hydro demolition quote in Stedman
STEDMAN · CUMBERLAND COUNTY
Need hydro demolition in Stedman?
Tell us about the Stedman property and we will set up a free visit.