Stokes hydro demolition, start to finish
Greenville is 10 miles from Stokes, and we cover both.
For the full scope of the service, see our hydro demolition page. Here we focus on Stokes: its housing, rules, ground and weather.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Typical home built
- 1991 (0% before 1980)
- Median home value
- $234,000
- Best months
- November through April
- County
- Pitt County
Hydro Demolition and the Stokes housing stock
Housing in Stokes breaks down as 90% detached houses, 11% mobile homes. Detached homes dominate, so most hydro demolition in Stokes is done for individual owners on their own lots.
The typical home in Stokes was built around 1991, close to the Pitt County median of 1993, according to American Community Survey estimates. Only 0% predate 1980, so around Stokes, specialty demolition targets older non-residential sites.
Stokes at a glance for hydro demolition
With no town government, Stokes (about 220 residents) falls under Pitt County for permits and ordinances.
Redevelopment of older industrial, civil and specialty structures drive most hydro demolition calls from Stokes.
Stokes and nearby towns for hydro demolition
10 miles from Greenville, Stokes is a Pitt County community with loose sand with groundwater close to the surface, which shapes staging and site protection.
According to Stokes on Wikipedia, Stokes is a long-standing community and stands about 52 feet up.
Check the Pitt County website for Stokes’ current fees and permit desks.
Other Pitt County communities we serve for hydro demolition: Greenville and Winterville.
Neighbors of Stokes we serve: Parmele, Robersonville, Bear Grass and Bethel.
Where debris from hydro demolition in Stokes goes
Mixed demolition debris from Stokes can go to C & D Landfill Inc in Greenville, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 8 miles off.
Permits and rules for hydro demolition in Stokes
Large and specialty demolition in Stokes needs a demolition permit from the Pitt County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Pitt County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Stokes are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program set the standards we work to in Stokes. Flood maps for Stokes are on the NC Flood Risk Information System.
When to book hydro demolition in Stokes
At about 52 feet above sea level, Stokes has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for hydro demolition here, with fewer tropical systems and less standing water; August and September are the hardest months.
The Tar and Neuse basins flooded to record levels during Hurricane Floyd in 1999, and buyouts afterward led to many homes being torn down, a reminder for property owners across Pitt County of how storms create demolition and clean-up work.
Pricing hydro demolition in Stokes
What is specific to pricing hydro demolition in Stokes:
- Floodplain steps. Low Stokes lots may need flood or coastal approvals first.
Map of our Stokes hydro demolition area
Book hydro demolition in Stokes
STOKES · PITT COUNTY
Need hydro demolition in Stokes?
Send your Stokes address for a free site visit and a fixed, itemized quote.