Hydro Demolition services in Vass, NC
Vass added 8.4% to its population from 2020 to 2024.
Everything the service includes is set out on our main hydro demolition page; this page covers what is specific to Vass.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the Town of Vass or county
- Typical home built
- 1988 (48% before 1980)
- Median home value
- $222,000
- Best months
- October and November
- County
- Moore County
What Vass’ homes tell us about hydro demolition
In Vass, the housing stock is 88% detached houses, 6% mobile homes. Most Vass hydro demolition jobs are on private single-family lots (American Community Survey).
Owner-occupancy in Vass sits at 68%, close to 66% statewide, giving a mix of hydro demolition customers.
Vass’ growth and demand for hydro demolition
U.S. Census Bureau figures show Vass going from 955 residents (2020) to 1,035 (2024), growth of 8.4%, ahead of the statewide 5.8%.
In a growing town like Vass, most hydro demolition calls come from redevelopment of older industrial, civil and specialty structures.
Where we provide hydro demolition near Vass
Vass sits in Moore County, about 21 miles from Fayetteville, in the Piedmont, where the ground is dense Piedmont clay with occasional rock. That affects how we stage equipment and protect the site.
Vass dates back to 1907, sits about 308 feet above sea level (Vass on Wikipedia).
For local ordinances and permit contacts, see the Town of Vass website and the Moore County website.
We also provide hydro demolition in Whispering Pines, Cameron, Southern Pines and Carthage.
Vass places that shape our hydro demolition work
- Leslie-Taylor House (about 1 mi from Vass). Properties in the neighborhoods around Leslie-Taylor House are covered by our Vass hydro demolition service, with access and parking checked at the site visit.
- Lakeview Historic District (about 2 mi from Vass). Work close to Lakeview Historic District has to respect historic character. If a property sits inside a local historic district, hydro demolition may need a Certificate of Appropriateness before anything is removed.
Vass landfills and transfer stations for hydro demolition
Mixed demolition debris from Vass can go to Moore County C&D Landfill in Aberdeen, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 14 miles off. Inert debris such as concrete and brick can also go to Weeks Sandpit #2 LCID in Cameron, a permitted LCID landfill roughly 9 miles from Vass.
Hydro Demolition permits and regulations in Vass
Large and specialty demolition in Vass needs a demolition permit from the Town of Vass or the Moore County inspections office, and often engineering review and specialist permits too. We confirm whether the Town of Vass or Moore County handles your Vass address, then file the permit there. 48% of Vass’ homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
Agencies whose rules apply to this work in Moore County: OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program.
Vass weather and hydro demolition scheduling
Sitting near 308 feet, Vass gets hot, humid summers with afternoon thunderstorms and short, mild winters broken by the odd ice storm. October and November is usually the best window for hydro demolition here, with cooler days, firmer ground and fewer thunderstorms; July and August are the hardest months.
Map of our Vass hydro demolition area
Book hydro demolition in Vass
VASS · MOORE COUNTY
Need hydro demolition in Vass?
One call or message gets a free Vass site visit and a price with every line spelled out.