About our hydro demolition work in Wanchese
Wanchese is part of our Coastal Plain service area.
Our hydro demolition page explains the work in general; below is what changes in Wanchese.
QUICK ANSWERS
- Hydro Demolition permit
- Required; we file it with the county
- Owner-occupied homes
- 73%
- Elevation
- About 7 ft
- Main soil
- Hobonny (very poorly drained)
- County
- Dare County
What Wanchese’s homes tell us about hydro demolition
Wanchese’s homes are 69% detached houses, 31% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in hydro demolition.
1985 is the median build year in Wanchese, close to the Dare County median of 1987, per the American Community Survey, and 38% of homes predate 1980: older structures around Wanchese are more likely to contain hazardous materials that must come out before demolition.
Who needs hydro demolition in Wanchese
With no town government, Wanchese (about 2,000 residents) falls under Dare County for permits and ordinances.
In Wanchese, hydro demolition is usually about redevelopment of older industrial, civil and specialty structures.
Wanchese and nearby towns for hydro demolition
In Dare County’s part of the Coastal Plain, Wanchese has flat, sandy ground that holds water after storms; our hydro demolition plan starts from that.
At roughly 7 feet of elevation, Wanchese has its own character; see Wanchese on Wikipedia.
Wanchese residents can find ordinances and permit contacts on the Dare County website.
Close to Wanchese, the same hydro demolition service covers Manteo, Nags Head, Manns Harbor and Kill Devil Hills.
Wanchese landfills and transfer stations for hydro demolition
Mixed demolition debris from Wanchese can go to Bay Disposal, LLC in Powells Point, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 21 miles off.
Wanchese rules that apply to hydro demolition
Specialty work in Wanchese starts with a permit from the Dare County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Wanchese is usually permitted by Dare County; we check for any town jurisdiction first, then file. 38% of Wanchese’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
We follow the requirements of OSHA: Demolition safety, NC DEQ: Division of Water Resources and NC DEQ: Stormwater program on every Wanchese job. Dare County is one of North Carolina's coastal counties, so work near water in Wanchese may need a permit from the NC Division of Coastal Management. Flood maps for Wanchese are on the NC Flood Risk Information System.
Wanchese weather and hydro demolition scheduling
Sitting near 7 feet, Wanchese is in hurricane country, with storm season running June to November and a water table close to the surface. Most Wanchese customers book hydro demolition for November through April. August and September bring peak hurricane season, heavy heat and saturated ground that stop work.
For Wanchese, the regional storm record includes this: storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes.
Wanchese hydro demolition pricing factors
Beyond size, materials and access, these Wanchese factors affect the price:
- Haul distance. With roughly 21 miles to the closest permitted site, fuller, fewer loads keep Wanchese haul costs down.
- Flood and coastal rules. Floodplain or CAMA steps can apply in Dare County.
Hydro Demolition near Wanchese: map
Get a free hydro demolition quote in Wanchese
WANCHESE · DARE COUNTY
Need hydro demolition in Wanchese?
Get a fixed hydro demolition price for your Wanchese property after a free visit.