Industrial Demolition services in Apex, NC
Apex grew about 18.1% between 2020 and 2024, faster than North Carolina as a whole.
For the full scope of the service, see our industrial demolition page. Here we focus on Apex: its housing, rules, ground and weather.
QUICK ANSWERS
- Industrial Demolition permit
- Required; we file it with the Town of Apex or county
- Best months
- October and November
- New homes permitted, 2024
- 2,051
- Population
- About 75,977 (2024 est.)
- Region
- Piedmont
Industrial Demolition and the Apex housing stock
In Apex, the housing stock is 68% detached houses, 14% apartments and condos. That mix means industrial demolition in Apex ranges from single homes to larger residential buildings (American Community Survey).
42% of Apex’s homes were built since 2010, and population moved up 18.1% from 2020 to 2024, which tells you how much new ground is being opened for industrial demolition.
Apex at a glance for industrial demolition
U.S. Census Bureau figures show Apex going from 64,324 residents (2020) to 75,977 (2024), growth of 18.1%, ahead of the statewide 5.8%.
Redevelopment of older industrial, civil and specialty structures: that is where most Apex industrial demolition calls come from.
Apex ground conditions and industrial demolition
Creedmoor is the soil you are most likely to dig into in Apex, per the USDA soil survey (7 of nine sampled points). It is moderately well drained and slow to absorb rain (hydrologic group C/D, when drained), on mapped slopes of 0–15%. The seasonal water table can rise to about 1 foot below the surface and the survey rates the ground “very limited” for homes with basements.
That “very limited” rating is a warning for any rebuild with a basement: drainage and waterproofing need a plan before the new foundation goes in. Because Apex’s soil absorbs rain slowly, bare ground after industrial demolition is graded to drain and stabilized quickly.
Apex brownfields and what they mean for industrial demolition
The NC Brownfields Program lists 2 sites in the Apex area, including Wurst Property and 400 N. Mason.
Redeveloping a brownfield follows a Brownfields Agreement with NC DEQ, which can limit how soil is disturbed and how the land is used, so industrial demolition on these sites is planned around the agreement’s land-use restrictions.
Where we provide industrial demolition near Apex
Apex is a Wake County community in North Carolina’s Piedmont, about 5 miles from Cary.
According to Apex on Wikipedia, Apex was founded in 1873 and stands about 499 feet up.
For local ordinances and permit contacts, see the Town of Apex website and the Wake County website.
Industrial Demolition is also available in Rolesville, Wendell, Zebulon, Garner, Raleigh and Knightdale, all in Wake County.
Neighbors of Apex we serve: Cary, Holly Springs, Morrisville and Fuquay-Varina.
Landmarks around Apex and industrial demolition
- Apex Town Hall (about 2 mi from Apex). The streets near Apex Town Hall are part of our Apex service area for industrial demolition.
- Apex Union Depot (about 2 mi from Apex). Older industrial sites such as Apex Union Depot are where careful dismantling pays off, with materials kept for reuse during industrial demolition.
- New Hill Historic District (about 5 mi from Apex). Work close to New Hill Historic District has to respect historic character. If a property sits inside a local historic district, industrial demolition may need a Certificate of Appropriateness before anything is removed.
Permitted disposal sites for industrial demolition near Apex
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Greenway Waste Solutions of Apex, LLC, about 3 miles from Apex. Inert debris such as concrete and brick can also go to Stone Landfill LCID in Chapel Hill, a permitted LCID landfill roughly 10 miles from Apex.
Industrial Demolition permits and regulations in Apex
Large and specialty demolition in Apex needs a demolition permit from the Town of Apex or the Wake County inspections office, and often engineering review and specialist permits too. The Town of Apex or Wake County inspections office issues the permit, and we handle the application for your Apex property. For Apex properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
Agencies whose rules apply to this work in Wake County: NC DEQ: Brownfields Program, EPA: Polychlorinated biphenyls (PCBs), EPA: Brownfields and OSHA: Demolition safety.
Best time for industrial demolition in Apex
Apex, around 499 feet up, gets hot, humid summers with afternoon thunderstorms and short, mild winters broken by the odd ice storm. Most Apex customers book industrial demolition for October and November. July and August bring heat stress and muddy ground after thunderstorms.
When Hurricane Fran reached the Triangle in 1996, its winds brought trees down onto homes across the region, a reminder for property owners across Wake County of how storms create demolition and clean-up work.
Map of our Apex industrial demolition area
Book industrial demolition in Apex
APEX · WAKE COUNTY
Need industrial demolition in Apex?
Send your Apex address for a free site visit and a fixed, itemized quote.