Selma industrial demolition, start to finish
Selma added 14.4% to its population from 2020 to 2024.
Our industrial demolition page explains the work in general; below is what changes in Selma.
QUICK ANSWERS
- Industrial Demolition permit
- Required; we file it with the Town of Selma or county
- Main soil
- Rains (poorly drained)
- Population
- About 7,228 (2024 est.)
- Region
- Coastal Plain
- Owner-occupied homes
- 44%
What Selma’s homes tell us about industrial demolition
Housing in Selma breaks down as 60% detached houses, 10% apartments and condos, 9% mobile homes. Expect industrial demolition in Selma to range from small lots to multi-unit properties (American Community Survey).
With 8% of housing built after 2010, Selma is mostly built out, and industrial demolition work reflects that.
Who needs industrial demolition in Selma
From 6,316 people in 2020, Selma reached about 7,228 by mid-2024 according to the U.S. Census Bureau, growth of 14.4%, ahead of the statewide 5.8%.
Here, demand for industrial demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
What Selma’s soil means for industrial demolition
The USDA soil survey maps Rains soils at 3 of nine points we checked across Selma. They are poorly drained and moderately fast-draining (hydrologic group B), on mapped slopes of 0–3%. The seasonal water table can rise to about 1 foot below the surface and the survey rates the ground “very limited” for homes with basements.
For owners planning to rebuild with a basement, the “very limited” rating means drainage deserves attention from the start. A water table near 1 foot means industrial demolition in Selma is easiest in dry weather, with dewatering ready for a wet spell.
Selma and nearby towns for industrial demolition
About 28 miles from Raleigh, Selma is part of our Johnston County service area for industrial demolition.
At roughly 174 feet of elevation, Selma, established in 1873, has its own character; see Selma on Wikipedia.
Check the Town of Selma website and the Johnston County website for Selma’s current fees and permit desks.
Other Johnston County communities we serve for industrial demolition: Archer Lodge and Clayton.
Close to Selma, the same industrial demolition service covers Pine Level, Smithfield, Wilson's Mills and Micro.
Industrial Demolition near Selma landmarks
- West Selma Historic District. Around West Selma Historic District, older buildings carry historic value, so we check local district rules before industrial demolition begins.
- Downtown Selma Historic District. Downtown Selma Historic District is a familiar Selma reference point; homes and businesses around it are part of our industrial demolition area.
- Everitt P. Stevens House. Everitt P. Stevens House is a reminder of Selma’s working past; on older sites nearby, sorting brick, timber and metal for reuse is part of industrial demolition.
Where debris from industrial demolition in Selma goes
Mixed demolition debris from Selma can go to Shotwell Landfill, Inc in Wendell, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 15 miles off. Inert debris such as concrete and brick can also go to Harnett County-Dunn/Erwin LCID Landfill, a permitted LCID landfill roughly 23 miles from Selma.
Permits and rules for industrial demolition in Selma
Specialty work in Selma starts with a permit from the Town of Selma or the Johnston County inspections office, plus any engineering or agency approvals the method needs. We confirm whether the Town of Selma or Johnston County handles your Selma address, then file the permit there. Asbestos rules for Selma are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
NC DEQ: Brownfields Program, EPA: Polychlorinated biphenyls (PCBs), EPA: Brownfields and OSHA: Demolition safety set the standards we work to in Selma. Flood maps for Selma are on the NC Flood Risk Information System.
When to book industrial demolition in Selma
At about 174 feet above sea level, Selma is in hurricane country, with storm season running June to November and a water table close to the surface. For industrial demolition in Selma, aim for November through April: milder weather and firmer ground once the storm season eases. Avoid August and September if you can, given the height of storm season, when heat and flooding halt work.
For Selma, the regional storm record includes this: when Hurricane Fran reached the Triangle in 1996, its winds brought trees down onto homes across the region.
Pricing industrial demolition in Selma
What is specific to pricing industrial demolition in Selma:
- Flood and coastal rules. Johnston County coastal and flood rules can add paperwork.
Map of our Selma industrial demolition area
Book industrial demolition in Selma
SELMA · JOHNSTON COUNTY
Need industrial demolition in Selma?
Get a fixed industrial demolition price for your Selma property after a free visit.