Infrastructure Demolition services in Bermuda Run, NC
Bermuda Run is about 12 miles from Winston-Salem, and our crews work across the area.
Everything the service includes is set out on our main infrastructure demolition page; this page covers what is specific to Bermuda Run.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the Town of Bermuda Run or county
- Typical home built
- 1998 (27% before 1980)
- Median home value
- $310,000
- Best months
- October and November
- County
- Davie County
What Bermuda Run’s homes tell us about infrastructure demolition
In Bermuda Run, the housing stock is 55% detached houses, 26% apartments and condos. That mix means infrastructure demolition in Bermuda Run ranges from single homes to larger residential buildings (American Community Survey).
With 14% of housing built after 2010, Bermuda Run is mostly built out, and infrastructure demolition work reflects that.
Bermuda Run’s growth and demand for infrastructure demolition
From 3,122 people in 2020, Bermuda Run reached about 3,290 by mid-2024 according to the U.S. Census Bureau, steady growth of 5.4%.
Here, demand for infrastructure demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
What Bermuda Run’s soil means for infrastructure demolition
Tomlin is the soil you are most likely to dig into in Bermuda Run, per the USDA soil survey (4 of nine sampled points). It is well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 2–15%.
Where we provide infrastructure demolition near Bermuda Run
Bermuda Run is a Davie County community in North Carolina’s Piedmont, about 12 miles from Winston-Salem.
Bermuda Run dates back to 1999, sits about 801 feet above sea level (Bermuda Run on Wikipedia).
For local ordinances and permit contacts, see the Town of Bermuda Run website and the Davie County website.
We also provide infrastructure demolition in Clemmons, Advance, Farmington and Lewisville.
Bermuda Run places that shape our infrastructure demolition work
- Win-Mock Farm Dairy (about 1 mi from Bermuda Run). Win-Mock Farm Dairy is a familiar Bermuda Run reference point; homes and businesses around it are part of our infrastructure demolition area.
- Tanglewood Park Arboretum and Rose Garden (about 1 mi from Bermuda Run). Near Tanglewood Park Arboretum and Rose Garden, we protect runoff and tree root zones from day one of infrastructure demolition, keeping sediment out of streams and green space.
- Jesse Helms Center (about 2 mi from Bermuda Run). Traffic around Jesse Helms Center shapes our schedule: trucks for infrastructure demolition are timed around event days, peak hours and road closures nearby.
Bermuda Run landfills and transfer stations for infrastructure demolition
For Bermuda Run, the closest permitted construction and demolition transfer station is Abbey Green Transfer Station in Winston-Salem (Forsyth County), roughly 11 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Veach Landfill, L.L.C. in Winston-Salem, a permitted LCID landfill roughly 14 miles from Bermuda Run.
Permits and rules for infrastructure demolition in Bermuda Run
Large and specialty demolition in Bermuda Run needs a demolition permit from the Town of Bermuda Run or the Davie County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with the Town of Bermuda Run or Davie County’s inspections office, whichever covers your address. 27% of Bermuda Run’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
Agencies whose rules apply to this work in Davie County: EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces.
When to book infrastructure demolition in Bermuda Run
At about 801 feet above sea level, Bermuda Run gets hot, humid summers with afternoon thunderstorms and short, mild winters broken by the odd ice storm. October and November is usually the best window for infrastructure demolition here, with cooler days, firmer ground and fewer thunderstorms; July and August are the hardest months.
Davie County remembers its storms. The December 2002 ice storm coated the central Piedmont in ice, bringing down trees and power lines and leaving well over a million homes without power.
Map of our Bermuda Run infrastructure demolition area
Book infrastructure demolition in Bermuda Run
BERMUDA RUN · DAVIE COUNTY
Need infrastructure demolition in Bermuda Run?
One call or message gets a free Bermuda Run site visit and a price with every line spelled out.