Infrastructure Demolition in Buies Creek
Apex is 23 miles from Buies Creek, and we cover both.
For the full scope of the service, see our infrastructure demolition page. Here we focus on Buies Creek: its housing, rules, ground and weather.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the county
- Nearest large city
- Apex, about 23 miles
- Typical home built
- 2002 (21% before 1980)
- Median home value
- $371,000
- Best months
- November through April
Infrastructure Demolition and the Buies Creek housing stock
By building type, Buies Creek is 31% detached houses, 20% apartments and condos, 10% mobile homes. Because Buies Creek has a real mix of housing, infrastructure demolition jobs vary widely in size and access (American Community Survey).
Buies Creek homes are worth about $371,000 at the median, versus $221,000 countywide, so infrastructure demolition that frees up land tends to pay off.
Buies Creek at a glance for infrastructure demolition
Buies Creek is an unincorporated community of about 3,600 people in Harnett County, so county rules generally apply rather than a town’s.
Most infrastructure demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Buies Creek ground conditions and infrastructure demolition
Norfolk is the soil you are most likely to dig into in Buies Creek, per the USDA soil survey (7 of nine sampled points). It is well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 0–25%. Bedrock can sit as shallow as about 5 feet and the seasonal water table can rise to about 4 feet below the surface.
Digs below about 5 feet in Buies Creek can hit rock, so deep footings, basements and trenches may need a hydraulic breaker.
Buies Creek and nearby towns for infrastructure demolition
Our infrastructure demolition crews cover Buies Creek and the rest of Harnett County, 23 miles from Apex.
According to Buies Creek on Wikipedia, Buies Creek is a long-standing community and stands about 213 feet up.
Local permit offices, fee schedules and notices are published on the Harnett County website.
Other Harnett County communities we serve for infrastructure demolition: Anderson Creek and Spout Springs.
Neighbors of Buies Creek we serve: Lillington, Coats, Bunnlevel and Erwin.
Infrastructure Demolition near Buies Creek landmarks
- Campbell University (about 1 mi from Buies Creek). Busy destinations like Campbell University bring traffic, so we plan hauling routes and times for infrastructure demolition to stay out of the way.
- Barker-Lane Stadium (about 1 mi from Buies Creek). Barker-Lane Stadium is a familiar Buies Creek reference point; homes and businesses around it are part of our infrastructure demolition area.
Where debris from infrastructure demolition in Buies Creek goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Harnett County Dunn-Erwin C&D Landfill, about 6 miles from Buies Creek. Clean concrete, brick and stumps have a closer option at Harnett County-Dunn/Erwin LCID Landfill, an LCID landfill about 6 miles away.
Permits and rules for infrastructure demolition in Buies Creek
Large and specialty demolition in Buies Creek needs a demolition permit from the Harnett County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Harnett County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Buies Creek are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
For infrastructure demolition in Buies Creek, the rules come from EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces. Flood maps for Buies Creek are on the NC Flood Risk Information System.
Best time for infrastructure demolition in Buies Creek
Buies Creek, around 213 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. Most Buies Creek customers book infrastructure demolition for November through April. August and September bring tropical weather and soaked ground that make sites unworkable.
When Hurricane Fran reached the Triangle in 1996, its winds brought trees down onto homes across the region, a reminder for property owners across Harnett County of how storms create demolition and clean-up work.
Buies Creek infrastructure demolition pricing factors
On top of the usual factors, a Buies Creek quote reflects:
- Coastal permitting. Floodplain or CAMA steps can apply in Harnett County.
Infrastructure Demolition near Buies Creek: map
Get a free infrastructure demolition quote in Buies Creek
BUIES CREEK · HARNETT COUNTY
Need infrastructure demolition in Buies Creek?
Send your Buies Creek address for a free site visit and a fixed, itemized quote.