Infrastructure Demolition services in Cape Colony, NC
Our Coastal Plain crews cover Cape Colony.
For the full scope of the service, see our infrastructure demolition page. Here we focus on Cape Colony: its housing, rules, ground and weather.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the county
- Elevation
- About 3 ft
- Main soil
- Dogue (moderately well drained)
- Population
- About 490
- Typical home built
- 1986 (29% before 1980)
Infrastructure Demolition and the Cape Colony housing stock
In Cape Colony, the housing stock is 93% detached houses, 7% mobile homes. Most Cape Colony infrastructure demolition jobs are on private single-family lots (American Community Survey).
The median Cape Colony home is worth about $178,000, a little below the Chowan County median of $204,000.
Cape Colony at a glance for infrastructure demolition
With no town government, Cape Colony (about 490 residents) falls under Chowan County for permits and ordinances.
Most infrastructure demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Cape Colony ground conditions and infrastructure demolition
Dogue is the soil you are most likely to dig into in Cape Colony, per the USDA soil survey (5 of nine sampled points). It is moderately well drained and slow to absorb rain (hydrologic group C), on mapped slopes of 0–6%. The seasonal water table can rise to about 2 feet below the surface.
With groundwater as close as 2 feet, open holes in Cape Colony can take on water, so pumping is planned for wet months and fill goes in compacted layers.
Where we provide infrastructure demolition near Cape Colony
Our infrastructure demolition crews cover Cape Colony and the rest of Chowan County.
According to Cape Colony on Wikipedia, Cape Colony is a long-standing community and stands about 3 feet up.
For local ordinances and permit contacts, see the Chowan County website.
Neighbors of Cape Colony we serve: Edenton, Roper, Hertford and Plymouth.
Infrastructure Demolition near Cape Colony landmarks
- Athol (about 1 mi from Cape Colony). Properties in the neighborhoods around Athol are covered by our Cape Colony infrastructure demolition service, with access and parking checked at the site visit.
- Hayes Plantation (about 2 mi from Cape Colony). Older industrial sites such as Hayes Plantation are where careful dismantling pays off, with materials kept for reuse during infrastructure demolition.
- Northeastern Regional Airport (about 1 mi from Cape Colony). Busy destinations like Northeastern Regional Airport bring traffic, so we plan hauling routes and times for infrastructure demolition to stay out of the way.
Where debris from infrastructure demolition in Cape Colony goes
Mixed demolition debris from Cape Colony can go to Soundside C&D Waste Transfer & Recycling Center in Jarvisburg, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 42 miles off.
Permits and rules for infrastructure demolition in Cape Colony
Large and specialty demolition in Cape Colony needs a demolition permit from the Chowan County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Chowan County’s inspections office, or a nearby town if the lot is in its jurisdiction. Asbestos rules for Cape Colony are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
Agencies whose rules apply to this work in Chowan County: EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces. Chowan County is one of North Carolina's coastal counties, so work near water in Cape Colony may need a permit from the NC Division of Coastal Management. Flood maps for Cape Colony are on the NC Flood Risk Information System.
Best time for infrastructure demolition in Cape Colony
Cape Colony, around 3 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. Most Cape Colony customers book infrastructure demolition for November through April. August and September bring storm threats and waterlogged lots that push jobs back.
Storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes, a reminder for property owners across Chowan County of how storms create demolition and clean-up work.
Cape Colony infrastructure demolition pricing factors
On top of the usual factors, a Cape Colony quote reflects:
- Haul distance. The nearest permitted facility for this debris is about 42 miles from Cape Colony, so trucking time is part of the price.
- Flood and coastal rules. Floodplain or CAMA steps can apply in Chowan County.
Map of our Cape Colony infrastructure demolition area
Book infrastructure demolition in Cape Colony
CAPE COLONY · CHOWAN COUNTY
Need infrastructure demolition in Cape Colony?
Send your Cape Colony address for a free site visit and a fixed, itemized quote.