Raemon infrastructure demolition, start to finish
Fayetteville is 38 miles from Raemon, and we cover both.
Our infrastructure demolition page explains the work in general; below is what changes in Raemon.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the county
- Nearest large city
- Fayetteville, about 38 miles
- Typical home built
- 1995 (0% before 1980)
- Median home value
- $82,000
- Best months
- November through April
Infrastructure Demolition and the Raemon housing stock
Housing in Raemon breaks down as 24% detached houses, 76% mobile homes. With mobile homes this common, infrastructure demolition in Raemon regularly includes older units and their pads (American Community Survey).
The median Raemon home is worth about $82,000, in line with Robeson County.
Who needs infrastructure demolition in Raemon
With no town government, Raemon (about 310 residents) falls under Robeson County for permits and ordinances.
Redevelopment of older industrial, civil and specialty structures drive most infrastructure demolition calls from Raemon.
Raemon ground conditions and infrastructure demolition
Across Raemon, the most common soil in the USDA soil survey is the Rains series (7 of nine sample points). It is poorly drained and sandy and fast-draining (hydrologic group A/D, when drained), on mapped slopes of 0–2%. The seasonal water table can rise to about 1 foot below the surface.
A water table near 1 foot means infrastructure demolition in Raemon is easiest in dry weather, with dewatering ready for a wet spell.
Infrastructure Demolition around Raemon and Robeson County
Our infrastructure demolition crews cover Raemon and the rest of Robeson County, 38 miles from Fayetteville.
At roughly 164 feet of elevation, Raemon has its own character; see Raemon on Wikipedia.
Check the Robeson County website for Raemon’s current fees and permit desks.
Close to Raemon, the same infrastructure demolition service covers Rowland, Elrod, Maxton and Raynham.
Where debris from infrastructure demolition in Raemon goes
For Raemon, the closest permitted construction and demolition landfill is Scotland County CDLF in Laurinburg (Scotland County), roughly 8 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to 401 Sand Company LCID Site in Raeford, a permitted LCID landfill roughly 30 miles from Raemon.
Infrastructure Demolition permits and regulations in Raemon
Specialty work in Raemon starts with a permit from the Robeson County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Raemon is usually permitted by Robeson County; we check for any town jurisdiction first, then file. Asbestos rules for Raemon are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces set the standards we work to in Raemon. Flood maps for Raemon are on the NC Flood Risk Information System.
Best time for infrastructure demolition in Raemon
Raemon, around 164 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. Most Raemon customers book infrastructure demolition for November through April. August and September bring the height of storm season, when heat and flooding halt work.
For Raemon, the regional storm record includes this: record rain from Hurricane Florence in 2018 flooded much of southeastern North Carolina, and many homes were demolished in the recovery.
Raemon infrastructure demolition pricing factors
On top of the usual factors, a Raemon quote reflects:
- Flood and coastal rules. Floodplain or CAMA steps can apply in Robeson County.
Map of our Raemon infrastructure demolition area
Book infrastructure demolition in Raemon
RAEMON · ROBESON COUNTY
Need infrastructure demolition in Raemon?
Get a fixed infrastructure demolition price for your Raemon property after a free visit.