About our infrastructure demolition work in Stallings
Stallings grew about 9.3% between 2020 and 2024, faster than North Carolina as a whole. Part of Stallings lies in Mecklenburg County.
Our infrastructure demolition page explains the work in general; below is what changes in Stallings.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the Town of Stallings or county
- Typical home built
- 2002 (11% before 1980)
- Median home value
- $382,000
- Best months
- October and November
- County
- Union County
Infrastructure Demolition and the Stallings housing stock
Stallings’ homes are 86% detached houses. Most Stallings infrastructure demolition jobs are on private single-family lots (American Community Survey).
20% of Stallings’ homes were built since 2010, and population moved up 9.3% from 2020 to 2024, which tells you how much new ground is being opened for infrastructure demolition.
Who needs infrastructure demolition in Stallings
U.S. Census Bureau figures show Stallings going from 16,122 residents (2020) to 17,617 (2024), growth of 9.3%, ahead of the statewide 5.8%.
Redevelopment of older industrial, civil and specialty structures: that is where most Stallings infrastructure demolition calls come from.
Stallings ground conditions and infrastructure demolition
No single soil dominates Stallings in the USDA soil survey; Cecil is the most common at the nine points we sampled, and the ground is mostly well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 0–8%. Bedrock can sit as shallow as about 4 feet and the seasonal water table can rise to about 2 feet below the surface.
Where rock is within 4 feet, deep infrastructure demolition work in Stallings may need breaking or ripping, which we check at the site visit. A water table near 2 feet means infrastructure demolition in Stallings is easiest in dry weather, with dewatering ready for a wet spell.
Stallings brownfields and what they mean for infrastructure demolition
One property in and around Stallings is enrolled in the NC Brownfields Program, among them Moser-Hall.
A Brownfields Agreement with NC DEQ can restrict digging, soil handling and future use; on these Stallings sites, infrastructure demolition starts with those restrictions.
Infrastructure Demolition around Stallings and Union County
Our infrastructure demolition crews cover Stallings and the rest of Union County, 12 miles from Charlotte.
At roughly 764 feet of elevation, Stallings has its own character; see Stallings on Wikipedia.
Stallings residents can find ordinances and permit contacts on the Town of Stallings website and the Union County website.
Other Union County communities we serve for infrastructure demolition: Weddington, Monroe and Waxhaw.
Close to Stallings, the same infrastructure demolition service covers Hemby Bridge, Lake Park, Matthews and Indian Trail.
Where debris from infrastructure demolition in Stallings goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Union County C&D in Wingate, about 12 miles from Stallings. Clean concrete, brick and stumps have a closer option at Griffin Farm LCID Landfill in Monroe, an LCID landfill about 10 miles away.
Stallings rules that apply to infrastructure demolition
Specialty work in Stallings starts with a permit from the Town of Stallings or the Union County inspections office, plus any engineering or agency approvals the method needs. We confirm whether the Town of Stallings or Union County handles your Stallings address, then file the permit there. Asbestos rules for Stallings are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
We follow the requirements of EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces on every Stallings job.
Best time for infrastructure demolition in Stallings
Stallings, around 764 feet up, sees warm, wet summers and mild winters, with ice storms a few times a decade. For infrastructure demolition in Stallings, aim for October and November: mild weather and dry clay that holds equipment. Avoid July and August if you can, given heat that limits crew hours and afternoon storms that turn bare clay to mud.
For Stallings, the regional storm record includes this: hurricane Hugo in September 1989 carried damaging winds far inland to the western Piedmont, bringing down trees across the Charlotte region.
Infrastructure Demolition near Stallings: map
Get a free infrastructure demolition quote in Stallings
STALLINGS · UNION COUNTY
Need infrastructure demolition in Stallings?
Get a fixed infrastructure demolition price for your Stallings property after a free visit.