TYRO · DAVIDSON COUNTY · NC

Infrastructure Demolition in Tyro, NC

Infrastructure Demolition in Tyro and across Davidson County, with a free site visit, a fixed quote and one crew from start to finish.

Service areaTyro & Davidson County
PopulationAbout 3,450
EstimateFree site visit, fixed quote

FREE ESTIMATE

Free infrastructure demolition quote in Tyro

Free, fixed & itemized. No obligation.

Or call us +1 984-254-7755

Infrastructure Demolition services in Tyro, NC

Tyro is about 22 miles from Winston-Salem, and our crews work across the area.

Everything the service includes is set out on our main infrastructure demolition page; this page covers what is specific to Tyro.

QUICK ANSWERS

Infrastructure Demolition permit
Required; we file it with the county
Nearest large city
Winston-Salem, about 22 miles
Typical home built
1990 (32% before 1980)
Median home value
$182,000
Best months
October and November

What Tyro’s homes tell us about infrastructure demolition

In Tyro, the housing stock is 58% detached houses, 41% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in infrastructure demolition (American Community Survey).

Home values in Tyro center on $182,000, close to the Davidson County median.

Tyro’s growth and demand for infrastructure demolition

About 3,450 people live in unincorporated Tyro, where Davidson County sets most of the rules.

In Tyro, infrastructure demolition is usually about redevelopment of older industrial, civil and specialty structures.

What Tyro’s soil means for infrastructure demolition

The USDA soil survey maps Cecil soils at 4 of nine points we checked across Tyro. They are well drained and moderately fast-draining (hydrologic group B), on mapped slopes of 2–25%.

Where we provide infrastructure demolition near Tyro

Tyro is a Davidson County community in North Carolina’s Piedmont, about 22 miles from Winston-Salem.

Tyro sits about 2,717 feet above sea level (Tyro on Wikipedia).

For local ordinances and permit contacts, see the Davidson County website.

We also provide infrastructure demolition in Yadkin College, Lexington, Spencer and East Spencer.

Tyro places that shape our infrastructure demolition work

  • Haden Place (about 3 mi from Tyro). The streets near Haden Place are part of our Tyro service area for infrastructure demolition.
  • Cooleemee (about 4 mi from Tyro). Older industrial sites such as Cooleemee are where careful dismantling pays off, with materials kept for reuse during infrastructure demolition.
  • Davidson County Executive Airport (about 4 mi from Tyro). With visitors heading to Davidson County Executive Airport, we keep trucks off the busiest roads and times while infrastructure demolition is underway.

Tyro landfills and transfer stations for infrastructure demolition

For Tyro, the closest permitted construction and demolition transfer station is Abbey Green Transfer Station in Winston-Salem (Forsyth County), roughly 18 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Veach Landfill, L.L.C. in Winston-Salem, a permitted LCID landfill roughly 16 miles from Tyro.

Infrastructure Demolition permits and regulations in Tyro

Large and specialty demolition in Tyro needs a demolition permit from the Davidson County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Davidson County’s inspections office, or a nearby town if the lot is in its jurisdiction. 32% of Tyro’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.

Agencies whose rules apply to this work in Davidson County: EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces.

When to book infrastructure demolition in Tyro

At about 2,717 feet above sea level, Tyro has Piedmont weather: steamy summers, pop-up storms and occasional winter ice. For infrastructure demolition in Tyro, aim for October and November: cooler days, firmer ground and fewer thunderstorms. Avoid July and August if you can, given heat stress and muddy ground after thunderstorms.

Davidson County remembers its storms. In December 2002 an ice storm left well over a million Piedmont homes without power as trees and lines came down.

Map of our Tyro infrastructure demolition area

Book infrastructure demolition in Tyro

TYRO · DAVIDSON COUNTY

Need infrastructure demolition in Tyro?

One call or message gets a free Tyro site visit and a price with every line spelled out.

LIVE · NATIONAL WEATHER SERVICE

Infrastructure Demolition weather outlook for Tyro this week

How the next seven days in Tyro, Davidson County affect infrastructure demolition, from the official National Weather Service forecast.

Loading the latest forecast for Tyro…

READY TO CLEAR THE SITE?

Tell us about your infrastructure demolition project in Tyro.

Send a few project details and our team will get back to you with the next steps.

Sends your details to us on WhatsApp for a fast, free estimate. No obligation.

FAQ

Infrastructure Demolition in Tyro: FAQs

Can’t find your answer? Call us or send your project details and a specialist will get back to you.

Ask a Specialist ↗
Is a permit required for infrastructure demolition in Tyro?

Large and specialty demolition in Tyro needs a demolition permit from the Davidson County inspections office, and often engineering review and specialist permits too.

How does Tyro’s ground affect infrastructure demolition?

The USDA soil survey shows mostly Cecil soils, well drained.

Where does the debris from Tyro jobs go?

For Tyro, the closest permitted construction and demolition transfer station is Abbey Green Transfer Station in Winston-Salem (Forsyth County), roughly 18 miles away, per the NC DEQ Solid Waste Section. Inert debris such as concrete and brick can also go to Veach Landfill, L.L.C. in Winston-Salem, a permitted LCID landfill roughly 16 miles from Tyro.

Where can I check Tyro permit rules myself?

The Davidson County website publishes local ordinances and permit contacts.

Last updated · Reviewed by the Alpha Demolition project team

Call usWhatsApp