Pool Removal in Surf City
With 28.4% growth since 2020, Surf City is outpacing the state. Part of Surf City lies in Onslow County.
For the full scope of the service, see our pool removal page. Here we focus on Surf City: its housing, rules, ground and weather.
QUICK ANSWERS
- Pool Removal permit
- Usually required; we file it with the Town of Surf City or county
- New homes permitted, 2024
- 185
- Population
- About 4,961 (2024 est.)
- Region
- Coastal Plain
- Owner-occupied homes
- 77%
What Surf City’s homes tell us about pool removal
The typical home in Surf City was built around 2002, newer than the Pender County median of 1997, according to American Community Survey estimates. Only 15% predate 1980, so most concrete removal in Surf City is upgrades and redesigns rather than failing slabs.
By building type, Surf City is 70% detached houses, 9% apartments and condos, 13% mobile homes. Expect pool removal in Surf City to range from small lots to multi-unit properties.
Surf City at a glance for pool removal
Surf City had 3,865 residents at the 2020 baseline, and the U.S. Census Bureau estimates 4,961 by July 2024, growth of 28.4%, ahead of the statewide 5.8%.
In 2024, 185 new housing units were authorized in Surf City (179 of them single-family), according to the Census Bureau building permits survey. New driveways and slabs go in with that construction, and older ones come out when lots are redone.
Surf City ground conditions and pool removal
No single soil dominates Surf City in the USDA soil survey; Newhan is the most common at the nine points we sampled, and the ground is mostly excessively drained and sandy and fast-draining (hydrologic group A), on mapped slopes of 0–30%. The seasonal water table can rise to about 2 feet below the surface and flooding is mapped as rare.
With groundwater as close as 2 feet, open holes in Surf City can take on water, so pumping is planned for wet months and fill goes in compacted layers. Fill in a removed pool is placed and compacted in layers, which matters on excessively drained ground like Surf City’s if the yard will carry a patio, addition or shed later.
Surf City and nearby towns for pool removal
Our pool removal crews cover Surf City and the rest of Pender County, 22 miles from Jacksonville.
According to Surf City on Wikipedia, Surf City was founded in 1949 and stands about 20 feet up.
Local permit offices, fee schedules and notices are published on the Town of Surf City website and the Pender County website.
Other Pender County communities we serve for pool removal: Rocky Point, St. Helena, Burgaw, Long Creek, Watha and Atkinson.
Neighbors of Surf City we serve: Holly Ridge, North Topsail Beach, Topsail Beach and Sneads Ferry.
Surf City landfills and transfer stations for pool removal
Loads of clean concrete, brick and block that can’t be recycled can go to an LCID (land-clearing and inert debris) landfill; the closest on the NC DEQ Solid Waste Section permitted list is Onslow County Landfill LCID Unit in Jacksonville, about 25 miles from Surf City. For Surf City, the closest permitted construction and demolition transfer station is Folkstone C&D Recycling Collection/Transfer Station in Holly Ridge (Onslow County), roughly 7 miles away, per the NC DEQ Solid Waste Section.
Permits and rules for pool removal in Surf City
Filling in or removing an in-ground pool in Surf City usually needs a permit from the Town of Surf City or the Pender County inspections office, and many jurisdictions inspect the backfill and compaction before closing it out. Above-ground pools usually need none. When a permit is needed, we file it with the Town of Surf City or Pender County’s inspections office, whichever covers your address.
For pool removal in Surf City, the rules come from NC DEQ: Erosion and sediment control, NC DEQ: Division of Water Resources and OSHA: Trenching and excavation. Pender County is one of North Carolina's coastal counties, so work near water in Surf City may need a permit from the NC Division of Coastal Management. Flood maps for Surf City are on the NC Flood Risk Information System.
Best time for pool removal in Surf City
At about 20 feet above sea level, Surf City has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For pool removal in Surf City, aim for November through April: fewer tropical systems and less standing water. Avoid August and September if you can, given tropical weather and soaked ground that make sites unworkable.
Hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward, a reminder for property owners across Pender County of how storms create demolition and clean-up work.
Surf City pool removal pricing factors
What is specific to pricing pool removal in Surf City:
- Local property values. With a median home value near $479,000 in Surf City, owners usually weigh the project against resale value, so we keep every line of the quote visible.
- Floodplain steps. Floodplain or CAMA steps can apply in Pender County.
Pool Removal near Surf City: map
Get a free pool removal quote in Surf City
SURF CITY · PENDER COUNTY
Need pool removal in Surf City?
Send your Surf City address for a free site visit and a fixed, itemized quote.