Cherry Branch silo demolition, start to finish
Jacksonville is 36 miles from Cherry Branch, and we cover both.
The general process is on the silo demolition page; this page is about doing it well in Cherry Branch.
QUICK ANSWERS
- Silo Demolition permit
- Required; we file it with the county
- Owner-occupied homes
- 78%
- Elevation
- About 3 ft
- Main soil
- Norfolk (well drained)
- Population
- About 1,300
Cherry Branch housing and what it means for silo demolition
Housing in Cherry Branch breaks down as 94% detached houses, 6% apartments and condos. Detached homes dominate, so most silo demolition in Cherry Branch is done for individual owners on their own lots (American Community Survey).
With 78% owner-occupancy against 66% statewide, silo demolition in Cherry Branch is mostly arranged directly with owners.
What drives silo demolition in Cherry Branch
Cherry Branch is an unincorporated community of about 1,300 people in Craven County, so county rules generally apply rather than a town’s.
In Cherry Branch, silo demolition is usually about redevelopment of older industrial, civil and specialty structures.
Cherry Branch and nearby towns for silo demolition
Ground in Cherry Branch means loose sand with groundwater close to the surface, typical of the Coastal Plain; we plan silo demolition around it, as we do across the Jacksonville area.
Some background: elevation near 3 feet (Cherry Branch on Wikipedia).
Check the Craven County website for Cherry Branch’s current fees and permit desks.
Other Craven County communities we serve for silo demolition: New Bern, River Bend, Vanceboro, Cove City, Dover and Fairfield Harbour.
Minnesott Beach, Havelock, Arapahoe and Neuse Forest are a short drive from Cherry Branch and on our silo demolition schedule too.
Where debris from silo demolition in Cherry Branch goes
The nearest active C&D transfer station on the NC DEQ Solid Waste Section permitted list is Green Recycling Transfer Station at Hibbs Road in Newport, about 13 miles from Cherry Branch. Inert debris such as concrete and brick can also go to Cieszko LCID in Havelock, a permitted LCID landfill roughly 5 miles from Cherry Branch.
Cherry Branch rules that apply to silo demolition
Specialty work in Cherry Branch starts with a permit from the Craven County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Cherry Branch is usually permitted by Craven County; we check for any town jurisdiction first, then file. For Cherry Branch properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
OSHA: Confined spaces, OSHA: Demolition safety and OSHA: Fall protection set the standards we work to in Cherry Branch. Craven County is one of North Carolina's coastal counties, so work near water in Cherry Branch may need a permit from the NC Division of Coastal Management. Flood maps for Cherry Branch are on the NC Flood Risk Information System.
When to book silo demolition in Cherry Branch
At about 3 feet above sea level, Cherry Branch sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for silo demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Craven County: record rain from Hurricane Florence in 2018 flooded much of southeastern North Carolina, and many homes were demolished in the recovery.
What silo demolition costs in Cherry Branch
Beyond size, materials and access, these Cherry Branch factors affect the price:
- Flood and coastal rules. Low Cherry Branch lots may need flood or coastal approvals first.
Map of our Cherry Branch silo demolition area
Book silo demolition in Cherry Branch
CHERRY BRANCH · CRAVEN COUNTY
Need silo demolition in Cherry Branch?
Tell us about the Cherry Branch property and we will set up a free visit.