Silo Demolition in Speed
Our silo demolition crews reach Speed as part of the wider Rocky Mount area, 20 miles away.
The general process is on the silo demolition page; this page is about doing it well in Speed.
QUICK ANSWERS
- Silo Demolition permit
- Required; we file it with the Town of Speed or county
- Owner-occupied homes
- 76%
- Elevation
- About 56 ft
- Main soil
- Norfolk (well drained)
- Population
- About 65 (2024 est.)
Silo Demolition and the Speed housing stock
By building type, Speed is 44% detached houses, 56% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes silo demolition around Speed (American Community Survey).
The median home value of $75,000 sits below the Edgecombe County median of $117,000, so owners weigh silo demolition against repair carefully.
What drives silo demolition in Speed
U.S. Census Bureau figures show Speed going from 64 residents (2020) to 65 (2024), a roughly stable population.
In a settled town like Speed, most silo demolition calls come from redevelopment of older industrial, civil and specialty structures.
Silo Demolition around Speed and Edgecombe County
Ground in Speed means sandy soil and a high water table, typical of the Coastal Plain; we plan silo demolition around it, as we do across the Rocky Mount area.
Some background: elevation near 56 feet (Speed on Wikipedia).
Local permit offices, fee schedules and notices are published on the Edgecombe County website.
Elsewhere in Edgecombe County, our silo demolition pages cover Conetoe, Pinetops and Macclesfield.
Hobgood, Princeville, Tarboro and Leggett are a short drive from Speed and on our silo demolition schedule too.
Speed landfills and transfer stations for silo demolition
Mixed demolition debris from Speed can go to Edgecombe County CDLF in Tarboro, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 12 miles off. Clean concrete, brick and stumps have a closer option at Barnhill Contracting LCID Landfill in Rocky Mount, an LCID landfill about 17 miles away.
Speed rules that apply to silo demolition
Specialty work in Speed starts with a permit from the Town of Speed or the Edgecombe County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Speed or Edgecombe County’s inspections office, whichever covers your address. Asbestos rules for Speed are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
For silo demolition in Speed, the rules come from OSHA: Confined spaces, OSHA: Demolition safety and OSHA: Fall protection. Flood maps for Speed are on the NC Flood Risk Information System.
Speed weather and silo demolition scheduling
Sitting near 56 feet, Speed has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For silo demolition in Speed, aim for November through April: comfortable temperatures and the end of the wettest stretch. Avoid August and September if you can, given tropical weather and soaked ground that make sites unworkable.
Storm history matters in Edgecombe County: hurricane Floyd’s 1999 floods along the Tar and Neuse rivers led to buyouts and the demolition of many flooded homes.
Pricing silo demolition in Speed
On top of the usual factors, a Speed quote reflects:
- Flood and coastal rules. Floodplain or CAMA steps can apply in Edgecombe County.
Silo Demolition near Speed: map
Get a free silo demolition quote in Speed
SPEED · EDGECOMBE COUNTY
Need silo demolition in Speed?
Tell us about the Speed property and we will set up a free visit.