Underwater Demolition services in Avon, NC
Avon lies in North Carolina’s Coastal Plain.
Everything the service includes is set out on our main underwater demolition page; this page covers what is specific to Avon.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Typical home built
- 1987 (21% before 1980)
- Median home value
- $292,000
- Best months
- November through April
- New homes permitted, 2024
- 241 (county)
Underwater Demolition and the Avon housing stock
In Avon, the housing stock is 88% detached houses, 5% mobile homes. Most Avon underwater demolition jobs are on private single-family lots.
Of Avon’s roughly 1,727 homes, 21% were built before 1980 and the median dates from 1987, close to the Dare County median of 1987 (American Community Survey). In practice, around Avon, specialty demolition targets older non-residential sites.
Avon’s growth and demand for underwater demolition
With no town government, Avon (about 370 residents) falls under Dare County for permits and ordinances.
In Avon, underwater demolition is usually about redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Avon
Avon sits in Dare County, in the Coastal Plain, where the ground is low-lying sandy soil over a shallow water table. That affects how we stage equipment and protect the site.
Avon sits about 13 feet above sea level (Avon on Wikipedia).
For local ordinances and permit contacts, see the Dare County website.
Underwater Demolition is also available in Nags Head, Kill Devil Hills, Kitty Hawk, Southern Shores, Duck and Waves, all in Dare County.
We also provide underwater demolition in Buxton, Frisco, Hatteras and Salvo.
Permitted disposal sites for underwater demolition near Avon
The nearest active C&D transfer station on the NC DEQ Solid Waste Section permitted list is Bay Disposal, LLC in Powells Point, about 56 miles from Avon.
Underwater Demolition permits and regulations in Avon
Large and specialty demolition in Avon needs a demolition permit from the Dare County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Dare County’s inspections office, or a nearby town if the lot is in its jurisdiction. For Avon properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
Agencies whose rules apply to this work in Dare County: NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Dare County is one of North Carolina's coastal counties, so work near water in Avon may need a permit from the NC Division of Coastal Management. Flood maps for Avon are on the NC Flood Risk Information System.
Best time for underwater demolition in Avon
Avon, around 13 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. Most Avon customers book underwater demolition for November through April. August and September bring storm threats and waterlogged lots that push jobs back.
Dare County remembers its storms. Storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes.
What underwater demolition costs in Avon
On top of the usual factors, a Avon quote reflects:
- Haul distance. The nearest permitted facility for this debris is about 56 miles from Avon, so trucking time is part of the price.
- Coastal permitting. Floodplain or CAMA steps can apply in Dare County.
Map of our Avon underwater demolition area
Book underwater demolition in Avon
AVON · DARE COUNTY
Need underwater demolition in Avon?
One call or message gets a free Avon site visit and a price with every line spelled out.