Chowan Beach underwater demolition, start to finish
Chowan Beach lies in North Carolina’s Coastal Plain.
Our underwater demolition page explains the work in general; below is what changes in Chowan Beach.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Population
- About 380
- Typical home built
- 1978 (62% before 1980)
- Elevation
- About 30 ft
- Main soil
- Wando (well drained)
Chowan Beach housing and what it means for underwater demolition
Housing in Chowan Beach breaks down as 34% detached houses, 66% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes underwater demolition around Chowan Beach.
1978 is the median build year in Chowan Beach, close to the Chowan County median of 1979, per the American Community Survey, and 62% of homes predate 1980: the age of Chowan Beach’s older buildings makes surveys for asbestos, lead and PCBs routine.
Who needs underwater demolition in Chowan Beach
About 380 people live in unincorporated Chowan Beach, where Chowan County sets most of the rules.
Redevelopment of older industrial, civil and specialty structures drive most underwater demolition calls from Chowan Beach.
Chowan Beach and nearby towns for underwater demolition
In Chowan County’s part of the Coastal Plain, Chowan Beach has loose sand with groundwater close to the surface; our underwater demolition plan starts from that.
At roughly 30 feet of elevation, Chowan Beach has its own character; see Chowan Beach on Wikipedia.
Check the Chowan County website for Chowan Beach’s current fees and permit desks.
Elsewhere in Chowan County, our underwater demolition pages cover Edenton and Cape Colony.
Close to Chowan Beach, the same underwater demolition service covers Arrowhead Beach, Colerain, Harrellsville and Powellsville.
Chowan Beach landfills and transfer stations for underwater demolition
Mixed demolition debris from Chowan Beach can go to Soundside C&D Waste Transfer & Recycling Center in Jarvisburg, the nearest active C&D transfer station permitted by the NC DEQ Solid Waste Section, about 48 miles off.
Chowan Beach rules that apply to underwater demolition
Specialty work in Chowan Beach starts with a permit from the Chowan County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Chowan Beach is usually permitted by Chowan County; we check for any town jurisdiction first, then file. 62% of Chowan Beach’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Chowan Beach. Chowan County is one of North Carolina's coastal counties, so work near water in Chowan Beach may need a permit from the NC Division of Coastal Management. Flood maps for Chowan Beach are on the NC Flood Risk Information System.
Chowan Beach weather and underwater demolition scheduling
Sitting near 30 feet, Chowan Beach has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for underwater demolition here, with milder weather and firmer ground once the storm season eases; August and September are the hardest months.
For Chowan Beach, the regional storm record includes this: storm surge from Hurricane Isabel in 2003 swept the Outer Banks and the sounds, damaging thousands of homes.
Chowan Beach underwater demolition pricing factors
Beyond size, materials and access, these Chowan Beach factors affect the price:
- Haul distance. With roughly 48 miles to the closest permitted site, fuller, fewer loads keep Chowan Beach haul costs down.
- Floodplain steps. Low Chowan Beach lots may need flood or coastal approvals first.
Map of our Chowan Beach underwater demolition area
Book underwater demolition in Chowan Beach
CHOWAN BEACH · CHOWAN COUNTY
Need underwater demolition in Chowan Beach?
Get a fixed underwater demolition price for your Chowan Beach property after a free visit.