Denton underwater demolition, start to finish
Our underwater demolition crews reach Denton as part of the wider High Point area, 25 miles away.
Our underwater demolition page explains the work in general; below is what changes in Denton.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Denton or county
- Region
- Piedmont
- Owner-occupied homes
- 63%
- Elevation
- About 722 ft
- Main soil
- Georgeville (well drained)
Denton housing and what it means for underwater demolition
Housing in Denton breaks down as 77% detached houses, 9% mobile homes. Detached homes dominate, so most underwater demolition in Denton is done for individual owners on their own lots (American Community Survey).
Owner-occupancy in Denton sits at 63%, close to 66% statewide, giving a mix of underwater demolition customers.
Who needs underwater demolition in Denton
From 1,492 people in 2020, Denton reached about 1,580 by mid-2024 according to the U.S. Census Bureau, steady growth of 5.9%.
Redevelopment of older industrial, civil and specialty structures: that is where most Denton underwater demolition calls come from.
Where we provide underwater demolition near Denton
In Davidson County’s part of the Piedmont, Denton has heavy red clay that holds water, and High Point is 25 miles away; our underwater demolition plan starts from that.
At roughly 722 feet of elevation, Denton, established in 1907, has its own character; see Denton on Wikipedia.
Check the Town of Denton website and the Davidson County website for Denton’s current fees and permit desks.
Close to Denton, the same underwater demolition service covers Southmont, Richfield, Lexington and Misenheimer.
Underwater Demolition near Denton landmarks
- Mor-Val Hosiery Mill (about 1 mi from Denton). Mor-Val Hosiery Mill is a reminder of Denton’s working past; on older sites nearby, sorting brick, timber and metal for reuse is part of underwater demolition.
Denton landfills and transfer stations for underwater demolition
Mixed demolition debris from Denton can go to Wall Recycling CDLF in Asheboro, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 19 miles off. Inert debris such as concrete and brick can also go to Veach Landfill, L.L.C. in Winston-Salem, a permitted LCID landfill roughly 24 miles from Denton.
Permits and rules for underwater demolition in Denton
Specialty work in Denton starts with a permit from the Town of Denton or the Davidson County inspections office, plus any engineering or agency approvals the method needs. When a permit is needed, we file it with the Town of Denton or Davidson County’s inspections office, whichever covers your address. 71% of Denton’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Denton.
Denton weather and underwater demolition scheduling
Sitting near 722 feet, Denton has Piedmont weather: steamy summers, pop-up storms and occasional winter ice. For underwater demolition in Denton, aim for October and November: mild weather and dry clay that holds equipment. Avoid July and August if you can, given peak heat plus storms that leave clay sites too wet to work.
For Denton, the regional storm record includes this: in December 2002 an ice storm left well over a million Piedmont homes without power as trees and lines came down.
Map of our Denton underwater demolition area
Book underwater demolition in Denton
DENTON · DAVIDSON COUNTY
Need underwater demolition in Denton?
Get a fixed underwater demolition price for your Denton property after a free visit.