Underwater Demolition services in Dover, NC
Dover is about 27 miles from Greenville, and our crews work across the area.
Everything the service includes is set out on our main underwater demolition page; this page covers what is specific to Dover.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Dover or county
- Region
- Coastal Plain
- Owner-occupied homes
- 65%
- Elevation
- About 62 ft
- Main soil
- Rains (poorly drained)
Underwater Demolition and the Dover housing stock
In Dover, the housing stock is 78% detached houses, 22% mobile homes. With mobile homes this common, underwater demolition in Dover regularly includes older units and their pads.
Of Dover’s roughly 194 homes, 63% were built before 1980 and the median dates from 1971, older than the Craven County median of 1990 (American Community Survey). In practice, the age of Dover’s older buildings makes surveys for asbestos, lead and PCBs routine.
Dover’s growth and demand for underwater demolition
Dover had 350 residents at the 2020 baseline, and the U.S. Census Bureau estimates 347 by July 2024, a roughly stable population.
Here, demand for underwater demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
Dover and nearby towns for underwater demolition
Dover sits in Craven County, about 27 miles from Greenville, in the Coastal Plain, where the ground is low-lying sandy soil over a shallow water table. That affects how we stage equipment and protect the site.
Dover sits about 62 feet above sea level (Dover on Wikipedia).
For local ordinances and permit contacts, see the Craven County website.
Underwater Demolition is also available in Vanceboro, River Bend, Trent Woods, New Bern, Brices Creek and Bridgeton, all in Craven County.
We also provide underwater demolition in Cove City, Graingers, Kinston and Jackson Heights.
Permitted disposal sites for underwater demolition near Dover
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Lenoir County CDLF in LaGrange, about 17 miles from Dover. Inert debris such as concrete and brick can also go to Craven LCID Landfill in New Bern, a permitted LCID landfill roughly 16 miles from Dover.
Permits and rules for underwater demolition in Dover
Large and specialty demolition in Dover needs a demolition permit from the Town of Dover or the Craven County inspections office, and often engineering review and specialist permits too. The Town of Dover or Craven County inspections office issues the permit, and we handle the application for your Dover property. For Dover properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
Agencies whose rules apply to this work in Craven County: NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Craven County is one of North Carolina's coastal counties, so work near water in Dover may need a permit from the NC Division of Coastal Management. Flood maps for Dover are on the NC Flood Risk Information System.
Best time for underwater demolition in Dover
Dover, around 62 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. Most Dover customers book underwater demolition for November through April. August and September bring storm threats and waterlogged lots that push jobs back.
Craven County remembers its storms. Hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward.
What underwater demolition costs in Dover
On top of the usual factors, a Dover quote reflects:
- Floodplain steps. Floodplain or CAMA steps can apply in Craven County.
Map of our Dover underwater demolition area
Book underwater demolition in Dover
DOVER · CRAVEN COUNTY
Need underwater demolition in Dover?
One call or message gets a free Dover site visit and a price with every line spelled out.