Underwater Demolition in Evergreen
Our Coastal Plain crews cover Evergreen.
The general process is on the underwater demolition page; this page is about doing it well in Evergreen.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Best months
- November through April
- New homes permitted, 2024
- 0 (county)
- Population
- About 300
- Typical home built
- 2001 (45% before 1980)
What Evergreen’s homes tell us about underwater demolition
By building type, Evergreen is 45% detached houses, 38% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes underwater demolition around Evergreen.
Census survey figures date the median Evergreen home to 2001 (newer than the Columbus County median of 1981); 45% of the 164 homes are older than 1980. For underwater demolition, that means older structures around Evergreen are more likely to contain hazardous materials that must come out before demolition.
What drives underwater demolition in Evergreen
With no town government, Evergreen (about 300 residents) falls under Columbus County for permits and ordinances.
In Evergreen, underwater demolition is usually about redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Evergreen
Ground in Evergreen means sandy soil and a high water table, typical of the Coastal Plain; we plan underwater demolition around it.
Some background: elevation near 108 feet (Evergreen on Wikipedia).
Local permit offices, fee schedules and notices are published on the Columbus County website.
Boardman, Cerro Gordo, Orrum and Chadbourn are a short drive from Evergreen and on our underwater demolition schedule too.
Where debris from underwater demolition in Evergreen goes
For Evergreen, the closest permitted construction and demolition landfill is Robeson County CDLF in Saint Pauls (Robeson County), roughly 26 miles away, per the NC DEQ Solid Waste Section. Clean concrete, brick and stumps have a closer option at Columbus County Landfill in Whiteville, an LCID landfill about 12 miles away.
Underwater Demolition permits and regulations in Evergreen
Specialty work in Evergreen starts with a permit from the Columbus County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Evergreen is usually permitted by Columbus County; we check for any town jurisdiction first, then file. Asbestos rules for Evergreen are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
For underwater demolition in Evergreen, the rules come from NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Flood maps for Evergreen are on the NC Flood Risk Information System.
When to book underwater demolition in Evergreen
At about 108 feet above sea level, Evergreen sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for underwater demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Columbus County: after Hurricane Florence’s record flooding in September 2018, flood-damaged homes across the southeast had to be removed.
Pricing underwater demolition in Evergreen
What is specific to pricing underwater demolition in Evergreen:
- Haul distance. With roughly 26 miles to the closest permitted site, fuller, fewer loads keep Evergreen haul costs down.
- Floodplain steps. Columbus County coastal and flood rules can add paperwork.
Underwater Demolition near Evergreen: map
Get a free underwater demolition quote in Evergreen
EVERGREEN · COLUMBUS COUNTY
Need underwater demolition in Evergreen?
Tell us about the Evergreen property and we will set up a free visit.