Five Points underwater demolition, start to finish
Five Points is about 22 miles from Fayetteville, and our crews work across the area.
The general process is on the underwater demolition page; this page is about doing it well in Five Points.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- County
- Hoke County
- Nearest large city
- Fayetteville, about 22 miles
- Typical home built
- 2002 (17% before 1980)
- Median home value
- $285,000
What Five Points’ homes tell us about underwater demolition
Housing in Five Points breaks down as 80% detached houses, 15% mobile homes. In a town of single-family lots like Five Points, underwater demolition usually happens with a driveway and yard to protect (American Community Survey).
Five Points homes are worth about $285,000 at the median, versus $196,000 countywide, so underwater demolition that frees up land tends to pay off.
What drives underwater demolition in Five Points
Five Points is an unincorporated community of about 1,150 people in Hoke County, so county rules generally apply rather than a town’s.
In Five Points, underwater demolition is usually about redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Five Points
Ground in Five Points means loose sand with groundwater close to the surface, typical of the Coastal Plain; we plan underwater demolition around it, as we do across the Fayetteville area.
Some background: elevation near 364 feet (Five Points on Wikipedia).
Check the Hoke County website for Five Points’ current fees and permit desks.
Ashley Heights, Deercroft, Bowmore and Silver City are a short drive from Five Points and on our underwater demolition schedule too.
Where debris from underwater demolition in Five Points goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Moore County C&D Landfill in Aberdeen, about 12 miles from Five Points. Inert debris such as concrete and brick can also go to 401 Sand Company LCID Site in Raeford, a permitted LCID landfill roughly 10 miles from Five Points.
Underwater Demolition permits and regulations in Five Points
Specialty work in Five Points starts with a permit from the Hoke County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Five Points is usually permitted by Hoke County; we check for any town jurisdiction first, then file. Asbestos rules for Five Points are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Five Points. Flood maps for Five Points are on the NC Flood Risk Information System.
When to book underwater demolition in Five Points
At about 364 feet above sea level, Five Points sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for underwater demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Hoke County: hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward.
Pricing underwater demolition in Five Points
What is specific to pricing underwater demolition in Five Points:
- Floodplain steps. Hoke County coastal and flood rules can add paperwork.
Map of our Five Points underwater demolition area
Book underwater demolition in Five Points
FIVE POINTS · HOKE COUNTY
Need underwater demolition in Five Points?
Tell us about the Five Points property and we will set up a free visit.