Kingstown underwater demolition, start to finish
Kingstown is about 26 miles from Gastonia, and our crews work across the area.
The general process is on the underwater demolition page; this page is about doing it well in Kingstown.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Kingstown or county
- Region
- Piedmont
- Owner-occupied homes
- 74%
- Elevation
- About 925 ft
- Main soil
- Pacolet (well drained)
What Kingstown’s homes tell us about underwater demolition
Housing in Kingstown breaks down as 97% detached houses, 4% mobile homes. In a town of single-family lots like Kingstown, underwater demolition usually happens with a driveway and yard to protect.
Census survey figures date the median Kingstown home to 1975 (older than the Cleveland County median of 1979); 74% of the 286 homes are older than 1980. For underwater demolition, that means the age of Kingstown’s older buildings makes surveys for asbestos, lead and PCBs routine.
What drives underwater demolition in Kingstown
U.S. Census Bureau figures show Kingstown going from 659 residents (2020) to 664 (2024), a roughly stable population.
In a settled town like Kingstown, most underwater demolition calls come from redevelopment of older industrial, civil and specialty structures.
Kingstown and nearby towns for underwater demolition
Ground in Kingstown means heavy red clay that holds water, typical of the Piedmont; we plan underwater demolition around it, as we do across the Gastonia area.
Some background: elevation near 925 feet (Kingstown on Wikipedia).
Check the Cleveland County website for Kingstown’s current fees and permit desks.
Lattimore, Polkville, Lawndale and Mooresboro are a short drive from Kingstown and on our underwater demolition schedule too.
Where debris from underwater demolition in Kingstown goes
Mixed demolition debris from Kingstown can go to Cleveland County CDLF in Shelby, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 8 miles off. Inert debris such as concrete and brick can also go to T&L Grading LCID Landfill in Gastonia, a permitted LCID landfill roughly 24 miles from Kingstown.
Kingstown rules that apply to underwater demolition
Specialty work in Kingstown starts with a permit from the Town of Kingstown or the Cleveland County inspections office, plus any engineering or agency approvals the method needs. We confirm whether the Town of Kingstown or Cleveland County handles your Kingstown address, then file the permit there. Asbestos rules for Kingstown are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Kingstown.
When to book underwater demolition in Kingstown
At about 925 feet above sea level, Kingstown sees warm, wet summers and mild winters, with ice storms a few times a decade. October and November is usually the best window for underwater demolition here, with firm ground and comfortable working days; July and August are the hardest months.
Storm history matters in Cleveland County: hurricane Hugo in September 1989 carried damaging winds far inland to the western Piedmont, bringing down trees across the Charlotte region.
Map of our Kingstown underwater demolition area
Book underwater demolition in Kingstown
KINGSTOWN · CLEVELAND COUNTY
Need underwater demolition in Kingstown?
Tell us about the Kingstown property and we will set up a free visit.