Maury underwater demolition, start to finish
Maury is about 15 miles from Greenville, and our crews work across the area.
Our underwater demolition page explains the work in general; below is what changes in Maury.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Region
- Coastal Plain
- Owner-occupied homes
- 37%
- Elevation
- About 259 ft
- Main soil
- Norfolk (well drained)
Maury housing and what it means for underwater demolition
Housing in Maury breaks down as 59% detached houses, 41% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes underwater demolition around Maury.
1974 is the median build year in Maury, older than the Greene County median of 1984, per the American Community Survey, and 71% of homes predate 1980: the age of Maury’s older buildings makes surveys for asbestos, lead and PCBs routine.
Who needs underwater demolition in Maury
Maury is an unincorporated community of about 1,050 people in Greene County, so county rules generally apply rather than a town’s.
Redevelopment of older industrial, civil and specialty structures drive most underwater demolition calls from Maury.
Maury and nearby towns for underwater demolition
In Greene County’s part of the Coastal Plain, Maury has loose sand with groundwater close to the surface, and Greenville is 15 miles away; our underwater demolition plan starts from that.
At roughly 259 feet of elevation, Maury has its own character; see Maury on Wikipedia.
Check the Greene County website for Maury’s current fees and permit desks.
Close to Maury, the same underwater demolition service covers Hookerton, Snow Hill, Farmville and Bell Arthur.
Maury landfills and transfer stations for underwater demolition
Mixed demolition debris from Maury can go to Greene County CDLF in Walstonburg, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 7 miles off. Inert debris such as concrete and brick can also go to Everett's LCID Pit in Kinston, a permitted LCID landfill roughly 13 miles from Maury.
Permits and rules for underwater demolition in Maury
Specialty work in Maury starts with a permit from the Greene County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Maury is usually permitted by Greene County; we check for any town jurisdiction first, then file. 71% of Maury’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Maury. Flood maps for Maury are on the NC Flood Risk Information System.
Maury weather and underwater demolition scheduling
Sitting near 259 feet, Maury has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. November through April is usually the best window for underwater demolition here, with milder weather and firmer ground once the storm season eases; August and September are the hardest months.
For Maury, the regional storm record includes this: the Tar and Neuse basins flooded to record levels during Hurricane Floyd in 1999, and buyouts afterward led to many homes being torn down.
Maury underwater demolition pricing factors
Beyond size, materials and access, these Maury factors affect the price:
- Flood and coastal rules. Low Maury lots may need flood or coastal approvals first.
Map of our Maury underwater demolition area
Book underwater demolition in Maury
MAURY · GREENE COUNTY
Need underwater demolition in Maury?
Get a fixed underwater demolition price for your Maury property after a free visit.