Underwater Demolition in Mesic
Mesic is part of our Coastal Plain service area.
The general process is on the underwater demolition page; this page is about doing it well in Mesic.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the Town of Mesic or county
- Elevation
- About 7 ft
- Main soil
- Yonges (poorly drained)
- Population
- About 143 (2024 est.)
- Typical home built
- 1981 (48% before 1980)
Underwater Demolition and the Mesic housing stock
By building type, Mesic is 74% detached houses, 26% mobile homes. With mobile homes this common, underwater demolition in Mesic regularly includes older units and their pads (American Community Survey).
With 78% owner-occupancy against 66% statewide, underwater demolition in Mesic is mostly arranged directly with owners.
What drives underwater demolition in Mesic
Mesic had 138 residents at the 2020 baseline, and the U.S. Census Bureau estimates 143 by July 2024, steady growth of 3.6%.
Here, demand for underwater demolition comes mostly from redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Mesic
Ground in Mesic means sandy soil and a high water table, typical of the Coastal Plain; we plan underwater demolition around it.
Some background: elevation near 7 feet (Mesic on Wikipedia).
Local permit offices, fee schedules and notices are published on the Town of Mesic website and the Pamlico County website.
Underwater Demolition is also available in Grantsboro, Oriental, Arapahoe and Minnesott Beach, all in Pamlico County.
Vandemere, Stonewall, Bayboro and Alliance are a short drive from Mesic and on our underwater demolition schedule too.
Permitted disposal sites for underwater demolition near Mesic
For Mesic, the closest permitted construction and demolition transfer station is Green Recycling Transfer Station at Hibbs Road in Newport (Carteret County), roughly 34 miles away, per the NC DEQ Solid Waste Section. Clean concrete, brick and stumps have a closer option at Cherry Point LCID, an LCID landfill about 24 miles away.
Permits and rules for underwater demolition in Mesic
Specialty work in Mesic starts with a permit from the Town of Mesic or the Pamlico County inspections office, plus any engineering or agency approvals the method needs. The Town of Mesic or Pamlico County inspections office issues the permit, and we handle the application for your Mesic property. For Mesic properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
For underwater demolition in Mesic, the rules come from NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Pamlico County is one of North Carolina's coastal counties, so work near water in Mesic may need a permit from the NC Division of Coastal Management. Flood maps for Mesic are on the NC Flood Risk Information System.
Best time for underwater demolition in Mesic
Mesic, around 7 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for underwater demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Pamlico County: hurricane Florence in September 2018 brought record rainfall and flooding to southeastern North Carolina, and many flood-damaged homes had to be taken down afterward.
What underwater demolition costs in Mesic
On top of the usual factors, a Mesic quote reflects:
- Haul distance. With roughly 34 miles to the closest permitted site, fuller, fewer loads keep Mesic haul costs down.
- Floodplain steps. Floodplain or CAMA steps can apply in Pamlico County.
Underwater Demolition near Mesic: map
Get a free underwater demolition quote in Mesic
MESIC · PAMLICO COUNTY
Need underwater demolition in Mesic?
Tell us about the Mesic property and we will set up a free visit.