Underwater Demolition services in Spout Springs, NC
Our underwater demolition crews reach Spout Springs as part of the wider Fayetteville area, 14 miles away.
The general process is on the underwater demolition page; this page is about doing it well in Spout Springs.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Region
- Coastal Plain
- Owner-occupied homes
- 76%
- Best months
- November through April
- New homes permitted, 2024
- 1,665 (county)
What Spout Springs’ homes tell us about underwater demolition
In Spout Springs, the housing stock is 93% detached houses, 7% mobile homes. In a town of single-family lots like Spout Springs, underwater demolition usually happens with a driveway and yard to protect (American Community Survey).
Spout Springs homes are worth about $310,000 at the median, versus $221,000 countywide, so underwater demolition that frees up land tends to pay off.
What drives underwater demolition in Spout Springs
Spout Springs is an unincorporated community of about 10,400 people in Harnett County, so county rules generally apply rather than a town’s.
Most underwater demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Spout Springs
Ground in Spout Springs means low-lying sandy soil over a shallow water table, typical of the Coastal Plain; we plan underwater demolition around it, as we do across the Fayetteville area.
More about the community is on Spout Springs on Wikipedia.
For local ordinances and permit contacts, see the Harnett County website.
Anderson Creek, Spring Lake, Mamers and Cameron are a short drive from Spout Springs and on our underwater demolition schedule too.
Where debris from underwater demolition in Spout Springs goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Harnett County Dunn-Erwin C&D Landfill, about 23 miles from Spout Springs. Inert debris such as concrete and brick can also go to Weeks Sandpit #2 LCID in Cameron, a permitted LCID landfill roughly 4 miles from Spout Springs.
Permits and rules for underwater demolition in Spout Springs
Specialty work in Spout Springs starts with a permit from the Harnett County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Spout Springs is usually permitted by Harnett County; we check for any town jurisdiction first, then file. Asbestos rules for Spout Springs are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
Agencies whose rules apply to this work in Harnett County: NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Flood maps for Spout Springs are on the NC Flood Risk Information System.
When to book underwater demolition in Spout Springs
Spout Springs sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. November through April is usually the best window for underwater demolition here, with comfortable temperatures and the end of the wettest stretch; August and September are the hardest months.
Storm history matters in Harnett County: hurricane Fran in September 1996 carried hurricane-force winds inland to the Triangle, toppling trees onto homes across the region.
Pricing underwater demolition in Spout Springs
What is specific to pricing underwater demolition in Spout Springs:
- Haul distance. With roughly 23 miles to the closest permitted site, fuller, fewer loads keep Spout Springs haul costs down.
- Coastal permitting. Harnett County coastal and flood rules can add paperwork.
Map of our Spout Springs underwater demolition area
Book underwater demolition in Spout Springs
SPOUT SPRINGS · HARNETT COUNTY
Need underwater demolition in Spout Springs?
Tell us about the Spout Springs property and we will set up a free visit.