Civil Demolition services in Mar-Mac, NC
Mar-Mac lies in North Carolina’s Coastal Plain.
For the full scope of the service, see our civil demolition page. Here we focus on Mar-Mac: its housing, rules, ground and weather.
QUICK ANSWERS
- Civil Demolition permit
- Required; we file it with the county
- Median home value
- $140,000
- Main soil
- Lakeland (excessively drained)
- County
- Wayne County
- Region
- Coastal Plain
What Mar-Mac’s homes tell us about civil demolition
In Mar-Mac, the housing stock is 51% detached houses, 11% apartments and condos, 29% mobile homes. That mobile-home share dwarfs North Carolina’s 11%, and it shapes civil demolition around Mar-Mac (American Community Survey).
About 63% of Mar-Mac households own their home, so civil demolition requests come from owners and landlords alike.
Mar-Mac at a glance for civil demolition
With no town government, Mar-Mac (about 2,500 residents) falls under Wayne County for permits and ordinances.
Redevelopment of older industrial, civil and specialty structures drive most civil demolition calls from Mar-Mac.
Soil and ground conditions for civil demolition in Mar-Mac
Lakeland is the soil you are most likely to dig into in Mar-Mac, per the USDA soil survey (3 of nine sampled points). It is excessively drained and sandy and fast-draining (hydrologic group A), on mapped slopes of 0–6%.
Mar-Mac and nearby towns for civil demolition
Mar-Mac is a Wayne County community in North Carolina’s Coastal Plain.
More about the community is on Mar-Mac on Wikipedia.
For local ordinances and permit contacts, see the Wayne County website.
Neighbors of Mar-Mac we serve: Brogden, Dudley, Goldsboro and Elroy.
Mar-Mac landfills and transfer stations for civil demolition
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is Wayne County CDLF in Dudley, about 3 miles from Mar-Mac. Inert debris such as concrete and brick can also go to Everett's LCID Pit in Kinston, a permitted LCID landfill roughly 19 miles from Mar-Mac.
Permits and rules for civil demolition in Mar-Mac
Large and specialty demolition in Mar-Mac needs a demolition permit from the Wayne County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Wayne County’s inspections office, or a nearby town if the lot is in its jurisdiction. For Mar-Mac properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
Agencies whose rules apply to this work in Wayne County: OSHA: Demolition safety, NC DEQ: Erosion and sediment control, EPA: Construction stormwater and EPA: Wetlands. Flood maps for Mar-Mac are on the NC Flood Risk Information System.
Mar-Mac weather and civil demolition scheduling
Mar-Mac has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For civil demolition in Mar-Mac, aim for November through April: fewer tropical systems and less standing water. Avoid August and September if you can, given storm threats and waterlogged lots that push jobs back.
Hurricane Floyd in September 1999 caused record flooding across the Tar and Neuse river basins, and the buyouts that followed meant many flooded homes were demolished, a reminder for property owners across Wayne County of how storms create demolition and clean-up work.
What civil demolition costs in Mar-Mac
What is specific to pricing civil demolition in Mar-Mac:
- Coastal permitting. Low Mar-Mac lots may need flood or coastal approvals first.
Map of our Mar-Mac civil demolition area
Book civil demolition in Mar-Mac
MAR-MAC · WAYNE COUNTY
Need civil demolition in Mar-Mac?
Send your Mar-Mac address for a free site visit and a fixed, itemized quote.