Mar-Mac infrastructure demolition, start to finish
Our Coastal Plain crews cover Mar-Mac.
Everything the service includes is set out on our main infrastructure demolition page; this page covers what is specific to Mar-Mac.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the county
- Best months
- November through April
- New homes permitted, 2024
- 487 (county)
- Population
- About 2,500
- Typical home built
- 1984 (46% before 1980)
What Mar-Mac’s homes tell us about infrastructure demolition
Housing in Mar-Mac breaks down as 51% detached houses, 11% apartments and condos, 29% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in infrastructure demolition (American Community Survey).
$140,000 is the typical Mar-Mac home value, a little below the Wayne County median of $163,000.
Mar-Mac’s growth and demand for infrastructure demolition
About 2,500 people live in unincorporated Mar-Mac, where Wayne County sets most of the rules.
Most infrastructure demolition requests here come from redevelopment of older industrial, civil and specialty structures.
What Mar-Mac’s soil means for infrastructure demolition
Lakeland is the soil you are most likely to dig into in Mar-Mac, per the USDA soil survey (3 of nine sampled points). It is excessively drained and sandy and fast-draining (hydrologic group A), on mapped slopes of 0–6%.
Where we provide infrastructure demolition near Mar-Mac
Mar-Mac is a Wayne County community in North Carolina’s Coastal Plain.
For background on the community, see Mar-Mac on Wikipedia.
Check the Wayne County website for Mar-Mac’s current fees and permit desks.
We also provide infrastructure demolition in Brogden, Dudley, Goldsboro and Elroy.
Mar-Mac landfills and transfer stations for infrastructure demolition
Mixed demolition debris from Mar-Mac can go to Wayne County CDLF in Dudley, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 3 miles off. Inert debris such as concrete and brick can also go to Everett's LCID Pit in Kinston, a permitted LCID landfill roughly 19 miles from Mar-Mac.
Permits and rules for infrastructure demolition in Mar-Mac
Large and specialty demolition in Mar-Mac needs a demolition permit from the Wayne County inspections office, and often engineering review and specialist permits too. When a permit is needed, we file it with Wayne County’s inspections office, or a nearby town if the lot is in its jurisdiction. 46% of Mar-Mac’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces set the standards we work to in Mar-Mac. Flood maps for Mar-Mac are on the NC Flood Risk Information System.
When to book infrastructure demolition in Mar-Mac
Mar-Mac has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For infrastructure demolition in Mar-Mac, aim for November through April: cooler days, drier ground and hurricane season winding down or over. Avoid August and September if you can, given the height of storm season, when heat and flooding halt work.
Wayne County remembers its storms. Hurricane Floyd’s 1999 floods along the Tar and Neuse rivers led to buyouts and the demolition of many flooded homes.
What infrastructure demolition costs in Mar-Mac
What is specific to pricing infrastructure demolition in Mar-Mac:
- Flood and coastal rules. Wayne County coastal and flood rules can add paperwork.
Map of our Mar-Mac infrastructure demolition area
Book infrastructure demolition in Mar-Mac
MAR-MAC · WAYNE COUNTY
Need infrastructure demolition in Mar-Mac?
One call or message gets a free Mar-Mac site visit and a price with every line spelled out.