About our infrastructure demolition work in Mamers
Mamers is about 22 miles from Apex, and our crews work across the area.
The general process is on the infrastructure demolition page; this page is about doing it well in Mamers.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the county
- Nearest large city
- Apex, about 22 miles
- Typical home built
- 1986 (38% before 1980)
- Median home value
- $139,000
- Best months
- November through April
Mamers housing and what it means for infrastructure demolition
Mamers’ homes are 79% detached houses, 21% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in infrastructure demolition (American Community Survey).
With Mamers homes at $139,000 versus $221,000 countywide, fixed pricing for infrastructure demolition matters.
What drives infrastructure demolition in Mamers
With no town government, Mamers (about 670 residents) falls under Harnett County for permits and ordinances.
Most infrastructure demolition requests here come from redevelopment of older industrial, civil and specialty structures.
Soil and ground conditions for infrastructure demolition in Mamers
Dothan is the soil you are most likely to dig into in Mamers, per the USDA soil survey (3 of nine sampled points). It is well drained and slow to absorb rain (hydrologic group C), on mapped slopes of 0–8%. The seasonal water table can rise to about 3 feet below the surface.
Where we provide infrastructure demolition near Mamers
About 22 miles from Apex, Mamers is part of our Harnett County service area for infrastructure demolition.
Some background: elevation near 1,099 feet (Mamers on Wikipedia).
Mamers residents can find ordinances and permit contacts on the Harnett County website.
Lillington, Broadway, Anderson Creek and Buies Creek are a short drive from Mamers and on our infrastructure demolition schedule too.
Permitted disposal sites for infrastructure demolition near Mamers
Mixed demolition debris from Mamers can go to Red Rock Disposal C&D Landfill in Holly Springs, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 13 miles off. Clean concrete, brick and stumps have a closer option at Bryant Grading LCID Landfill in Fuquay-Varina, an LCID landfill about 10 miles away.
Infrastructure Demolition permits and regulations in Mamers
Specialty work in Mamers starts with a permit from the Harnett County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Mamers is usually permitted by Harnett County; we check for any town jurisdiction first, then file. For Mamers properties, the state Health Hazards Control Unit handles asbestos notices, and we file what is required before work starts.
We follow the requirements of EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces on every Mamers job. Flood maps for Mamers are on the NC Flood Risk Information System.
Mamers weather and infrastructure demolition scheduling
Sitting near 1,099 feet, Mamers is in hurricane country, with storm season running June to November and a water table close to the surface. Most Mamers customers book infrastructure demolition for November through April. August and September bring peak hurricane season, heavy heat and saturated ground that stop work.
Storm history matters in Harnett County: hurricane Fran in September 1996 carried hurricane-force winds inland to the Triangle, toppling trees onto homes across the region.
Pricing infrastructure demolition in Mamers
Beyond size, materials and access, these Mamers factors affect the price:
- Flood and coastal rules. Low Mamers lots may need flood or coastal approvals first.
Infrastructure Demolition near Mamers: map
Get a free infrastructure demolition quote in Mamers
MAMERS · HARNETT COUNTY
Need infrastructure demolition in Mamers?
Tell us about the Mamers property and we will set up a free visit.