Underwater Demolition in Mamers
Our underwater demolition crews reach Mamers as part of the wider Apex area, 22 miles away.
Our underwater demolition page explains the work in general; below is what changes in Mamers.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- County
- Harnett County
- Nearest large city
- Apex, about 22 miles
- Typical home built
- 1986 (38% before 1980)
- Median home value
- $139,000
Mamers housing and what it means for underwater demolition
By building type, Mamers is 79% detached houses, 21% mobile homes. Mobile homes are far more common here than the 11% statewide, so pads, tie-downs and skirting come up constantly in underwater demolition (American Community Survey).
With Mamers homes at $139,000 versus $221,000 countywide, fixed pricing for underwater demolition matters.
Who needs underwater demolition in Mamers
Mamers is an unincorporated community of about 670 people in Harnett County, so county rules generally apply rather than a town’s.
Redevelopment of older industrial, civil and specialty structures drive most underwater demolition calls from Mamers.
Mamers and nearby towns for underwater demolition
In Harnett County’s part of the Coastal Plain, Mamers has sandy soil and a high water table, and Apex is 22 miles away; our underwater demolition plan starts from that.
At roughly 1,099 feet of elevation, Mamers has its own character; see Mamers on Wikipedia.
Local permit offices, fee schedules and notices are published on the Harnett County website.
Close to Mamers, the same underwater demolition service covers Lillington, Broadway, Anderson Creek and Buies Creek.
Mamers landfills and transfer stations for underwater demolition
Mixed demolition debris from Mamers can go to Red Rock Disposal C&D Landfill in Holly Springs, the nearest active C&D landfill permitted by the NC DEQ Solid Waste Section, about 13 miles off. Clean concrete, brick and stumps have a closer option at Bryant Grading LCID Landfill in Fuquay-Varina, an LCID landfill about 10 miles away.
Mamers rules that apply to underwater demolition
Specialty work in Mamers starts with a permit from the Harnett County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Mamers is usually permitted by Harnett County; we check for any town jurisdiction first, then file. 38% of Mamers’ homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
For underwater demolition in Mamers, the rules come from NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands. Flood maps for Mamers are on the NC Flood Risk Information System.
Mamers weather and underwater demolition scheduling
Sitting near 1,099 feet, Mamers has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For underwater demolition in Mamers, aim for November through April: milder weather and firmer ground once the storm season eases. Avoid August and September if you can, given tropical weather and soaked ground that make sites unworkable.
For Mamers, the regional storm record includes this: when Hurricane Fran reached the Triangle in 1996, its winds brought trees down onto homes across the region.
Mamers underwater demolition pricing factors
Beyond size, materials and access, these Mamers factors affect the price:
- Coastal permitting. Low Mamers lots may need flood or coastal approvals first.
Underwater Demolition near Mamers: map
Get a free underwater demolition quote in Mamers
MAMERS · HARNETT COUNTY
Need underwater demolition in Mamers?
Get a fixed underwater demolition price for your Mamers property after a free visit.