Infrastructure Demolition services in New Bern, NC
New Bern grew about 9.3% between 2020 and 2024, faster than North Carolina as a whole.
For the full scope of the service, see our infrastructure demolition page. Here we focus on New Bern: its housing, rules, ground and weather.
QUICK ANSWERS
- Infrastructure Demolition permit
- Required; we file it with the City of New Bern or county
- Nearest large city
- Jacksonville, about 31 miles
- Typical home built
- 1990 (37% before 1980)
- Median home value
- $212,000
- Best months
- November through April
Infrastructure Demolition and the New Bern housing stock
In New Bern, the housing stock is 65% detached houses, 18% apartments and condos, 5% mobile homes. Because New Bern has a real mix of housing, infrastructure demolition jobs vary widely in size and access (American Community Survey).
Home values in New Bern center on $212,000, close to the Craven County median.
New Bern at a glance for infrastructure demolition
U.S. Census Bureau figures show New Bern going from 31,317 residents (2020) to 34,218 (2024), growth of 9.3%, ahead of the statewide 5.8%.
Redevelopment of older industrial, civil and specialty structures: that is where most New Bern infrastructure demolition calls come from.
New Bern ground conditions and infrastructure demolition
New Bern’s soils are mixed: across nine sample points the USDA soil survey maps Tarboro most often, mostly somewhat excessively drained and sandy and fast-draining (hydrologic group A), on mapped slopes of 0–8%. The seasonal water table can rise to about 2 feet below the surface.
With groundwater as close as 2 feet, open holes in New Bern can take on water, so pumping is planned for wet months and fill goes in compacted layers.
Former industrial land and infrastructure demolition in New Bern
The NC Brownfields Program lists 7 sites in the New Bern area, including Clarke Power Services, Coastal Lumber and Carolina Technical Plastics.
Redeveloping a brownfield follows a Brownfields Agreement with NC DEQ, which can limit how soil is disturbed and how the land is used, so infrastructure demolition on these sites is planned around the agreement’s land-use restrictions.
New Bern and nearby towns for infrastructure demolition
Our infrastructure demolition crews cover New Bern and the rest of Craven County, 31 miles from Jacksonville.
According to New Bern on Wikipedia, New Bern was founded in 1710 and stands about 10 feet up, near Neuse River and Trent River.
For local ordinances and permit contacts, see the City of New Bern website and the Craven County website.
Neighbors of New Bern we serve: Trent Woods, Bridgeton, Brices Creek and River Bend.
Infrastructure Demolition near New Bern landmarks
- Attmore-Oliver House. The streets near Attmore-Oliver House are part of our New Bern service area for infrastructure demolition.
Where debris from infrastructure demolition in New Bern goes
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is The Maysville Construction and Demolition Landfill, about 15 miles from New Bern. Inert debris such as concrete and brick can also go to Craven LCID Landfill in New Bern, a permitted LCID landfill roughly 7 miles from New Bern.
New Bern rules that apply to infrastructure demolition
Large and specialty demolition in New Bern needs a demolition permit from the City of New Bern or the Craven County inspections office, and often engineering review and specialist permits too. We confirm whether the City of New Bern or Craven County handles your New Bern address, then file the permit there. Asbestos rules for New Bern are set by the state Health Hazards Control Unit. The state asks for demolition notices at least 10 working days before work starts and strongly recommends an asbestos inspection for every building, including single-family homes.
Agencies whose rules apply to this work in Craven County: EPA: Polychlorinated biphenyls (PCBs), EPA: Lead and OSHA: Confined spaces. Craven County is one of North Carolina's coastal counties, so work near water in New Bern may need a permit from the NC Division of Coastal Management. Flood maps for New Bern are on the NC Flood Risk Information System.
Best time for infrastructure demolition in New Bern
New Bern, around 10 feet up, sees long, humid summers and a hurricane season from June through November; low ground stays wet for days after heavy rain. Most New Bern customers book infrastructure demolition for November through April. August and September bring storm threats and waterlogged lots that push jobs back.
After Hurricane Florence’s record flooding in September 2018, flood-damaged homes across the southeast had to be removed, a reminder for property owners across Craven County of how storms create demolition and clean-up work. Lots near Neuse River and Trent River get extra silt fence and runoff control during infrastructure demolition.
New Bern infrastructure demolition pricing factors
On top of the usual factors, a New Bern quote reflects:
- Floodplain steps. Floodplain or CAMA steps can apply in Craven County.
Map of our New Bern infrastructure demolition area
Book infrastructure demolition in New Bern
NEW BERN · CRAVEN COUNTY
Need infrastructure demolition in New Bern?
Send your New Bern address for a free site visit and a fixed, itemized quote.