About our selective demolition work in New Bern
New Bern grew about 9.3% between 2020 and 2024, faster than North Carolina as a whole.
Our selective demolition page explains the work in general; below is what changes in New Bern.
QUICK ANSWERS
- Selective Demolition permit
- Required; we file it with the City of New Bern or county
- Main soil
- Tarboro (somewhat excessively drained)
- County
- Craven County
- Nearest large city
- Jacksonville, about 31 miles
- Typical home built
- 1990 (37% before 1980)
Selective Demolition and the New Bern housing stock
1990 is the median build year in New Bern, close to the Craven County median of 1990, per the American Community Survey, and 37% of homes predate 1980: older materials like asbestos siding, floor tile and lead paint are a real possibility in New Bern, so we test before any teardown.
Home values in New Bern center on $212,000, close to the Craven County median.
Who needs selective demolition in New Bern
New Bern had 31,317 residents at the 2020 baseline, and the U.S. Census Bureau estimates 34,218 by July 2024, growth of 9.3%, ahead of the statewide 5.8%.
Builders pulled permits for 303 new homes and apartments in New Bern in 2024, 284 of them single-family, per the Census Bureau building permits survey.
Where we provide selective demolition near New Bern
In Craven County’s part of the Coastal Plain, New Bern has flat, sandy ground that holds water after storms, and Jacksonville is 31 miles away; our selective demolition plan starts from that.
At roughly 10 feet of elevation, New Bern, established in 1710, sits by Neuse River and Trent River; see New Bern on Wikipedia.
New Bern residents can find ordinances and permit contacts on the City of New Bern website and the Craven County website.
Selective Demolition is also available in James City, Fairfield Harbour and Havelock, all in Craven County.
Close to New Bern, the same selective demolition service covers Trent Woods, Bridgeton, Brices Creek and River Bend.
Selective Demolition near New Bern landmarks
- Cedar Grove Cemetery. The streets near Cedar Grove Cemetery are part of our New Bern service area for selective demolition.
Permitted disposal sites for selective demolition near New Bern
For New Bern, the closest permitted construction and demolition landfill is The Maysville Construction and Demolition Landfill (Jones County), roughly 15 miles away, per the NC DEQ Solid Waste Section. Clean concrete, brick and stumps have a closer option at Craven LCID Landfill in New Bern, an LCID landfill about 7 miles away.
Selective Demolition permits and regulations in New Bern
Demolishing a building in New Bern requires a permit from the City of New Bern or the Craven County inspections office. When a permit is needed, we file it with the City of New Bern or Craven County’s inspections office, whichever covers your address. 37% of New Bern’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
We follow the requirements of OSHA: Demolition safety, OSHA: Respirable crystalline silica, EPA: Lead Renovation, Repair and Painting and EPA: Indoor air quality on every New Bern job. Craven County is one of North Carolina's coastal counties, so work near water in New Bern may need a permit from the NC Division of Coastal Management. Flood maps for New Bern are on the NC Flood Risk Information System.
When to book selective demolition in New Bern
Sitting near 10 feet, New Bern is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for selective demolition here, with milder weather and firmer ground once the storm season eases; August and September are the hardest months.
For New Bern, the regional storm record includes this: after Hurricane Florence’s record flooding in September 2018, flood-damaged homes across the southeast had to be removed. Lots near Neuse River and Trent River get extra silt fence and runoff control during selective demolition.
New Bern selective demolition pricing factors
What is specific to pricing selective demolition in New Bern:
- Local property values. With a median home value near $212,000 in New Bern, owners usually weigh removal against renovation, so we keep every line of the quote visible.
- Floodplain steps. Floodplain or CAMA steps can apply in Craven County.
Selective Demolition near New Bern: map
Get a free selective demolition quote in New Bern
NEW BERN · CRAVEN COUNTY
Need selective demolition in New Bern?
Get a fixed selective demolition price for your New Bern property after a free visit.