Swan Quarter silo demolition, start to finish
Swan Quarter lies in North Carolina’s Coastal Plain.
Our silo demolition page explains the work in general; below is what changes in Swan Quarter.
QUICK ANSWERS
- Silo Demolition permit
- Required; we file it with the county
- Main soil
- Hydeland (very poorly drained)
- Population
- About 290
- Typical home built
- 1963 (80% before 1980)
- Median home value
- $110,000
What Swan Quarter’s homes tell us about silo demolition
Housing in Swan Quarter breaks down as 80% detached houses. In a town of single-family lots like Swan Quarter, silo demolition usually happens with a driveway and yard to protect (American Community Survey).
Homeowners own 95% of occupied homes in Swan Quarter (statewide: 66%), and they make up most of our silo demolition work there.
Who needs silo demolition in Swan Quarter
Swan Quarter is an unincorporated community of about 290 people in Hyde County, so county rules generally apply rather than a town’s.
In Swan Quarter, silo demolition is usually about redevelopment of older industrial, civil and specialty structures.
Swan Quarter and nearby towns for silo demolition
In Hyde County’s part of the Coastal Plain, Swan Quarter has loose sand with groundwater close to the surface; our silo demolition plan starts from that.
At roughly 7 feet of elevation, Swan Quarter has its own character; see Swan Quarter on Wikipedia.
Check the Swan Quarter website and the Hyde County website for Swan Quarter’s current fees and permit desks.
Close to Swan Quarter, the same silo demolition service covers Fairfield, Engelhard, Belhaven and Pantego.
Permitted disposal sites for silo demolition near Swan Quarter
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is C & D Landfill Inc in Greenville, about 51 miles from Swan Quarter.
Swan Quarter rules that apply to silo demolition
Specialty work in Swan Quarter starts with a permit from the Hyde County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Swan Quarter is usually permitted by Hyde County; we check for any town jurisdiction first, then file. 80% of Swan Quarter’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
OSHA: Confined spaces, OSHA: Demolition safety and OSHA: Fall protection set the standards we work to in Swan Quarter. Hyde County is one of North Carolina's coastal counties, so work near water in Swan Quarter may need a permit from the NC Division of Coastal Management. Flood maps for Swan Quarter are on the NC Flood Risk Information System.
Best time for silo demolition in Swan Quarter
Swan Quarter, around 7 feet up, is in hurricane country, with storm season running June to November and a water table close to the surface. November through April is usually the best window for silo demolition here, with milder weather and firmer ground once the storm season eases; August and September are the hardest months.
For Swan Quarter, the regional storm record includes this: thousands of homes along the Outer Banks and northeastern sounds were damaged by Hurricane Isabel’s surge in September 2003.
Swan Quarter silo demolition pricing factors
What is specific to pricing silo demolition in Swan Quarter:
- Haul distance. With roughly 51 miles to the closest permitted site, fuller, fewer loads keep Swan Quarter haul costs down.
- Floodplain steps. Hyde County coastal and flood rules can add paperwork.
Map of our Swan Quarter silo demolition area
Book silo demolition in Swan Quarter
SWAN QUARTER · HYDE COUNTY
Need silo demolition in Swan Quarter?
Get a fixed silo demolition price for your Swan Quarter property after a free visit.