Swan Quarter underwater demolition, start to finish
Our Coastal Plain crews cover Swan Quarter.
Our underwater demolition page explains the work in general; below is what changes in Swan Quarter.
QUICK ANSWERS
- Underwater Demolition permit
- Required; we file it with the county
- Elevation
- About 7 ft
- Main soil
- Hydeland (very poorly drained)
- Population
- About 290
- Typical home built
- 1963 (80% before 1980)
Swan Quarter housing and what it means for underwater demolition
Housing in Swan Quarter breaks down as 80% detached houses. Detached homes dominate, so most underwater demolition in Swan Quarter is done for individual owners on their own lots.
1963 is the median build year in Swan Quarter, older than the Hyde County median of 1978, per the American Community Survey, and 80% of homes predate 1980: the age of Swan Quarter’s older buildings makes surveys for asbestos, lead and PCBs routine.
Who needs underwater demolition in Swan Quarter
Swan Quarter is an unincorporated community of about 290 people in Hyde County, so county rules generally apply rather than a town’s.
In Swan Quarter, underwater demolition is usually about redevelopment of older industrial, civil and specialty structures.
Where we provide underwater demolition near Swan Quarter
In Hyde County’s part of the Coastal Plain, Swan Quarter has loose sand with groundwater close to the surface; our underwater demolition plan starts from that.
At roughly 7 feet of elevation, Swan Quarter has its own character; see Swan Quarter on Wikipedia.
Check the Swan Quarter website and the Hyde County website for Swan Quarter’s current fees and permit desks.
Close to Swan Quarter, the same underwater demolition service covers Fairfield, Engelhard, Belhaven and Pantego.
Swan Quarter landfills and transfer stations for underwater demolition
The nearest active C&D landfill on the NC DEQ Solid Waste Section permitted list is C & D Landfill Inc in Greenville, about 51 miles from Swan Quarter.
Permits and rules for underwater demolition in Swan Quarter
Specialty work in Swan Quarter starts with a permit from the Hyde County inspections office, plus any engineering or agency approvals the method needs. Unincorporated Swan Quarter is usually permitted by Hyde County; we check for any town jurisdiction first, then file. 80% of Swan Quarter’s homes predate 1980, so asbestos rules from the state Health Hazards Control Unit apply to many jobs here.
NC Division of Coastal Management, OSHA: Commercial diving operations and EPA: Wetlands set the standards we work to in Swan Quarter. Hyde County is one of North Carolina's coastal counties, so work near water in Swan Quarter may need a permit from the NC Division of Coastal Management. Flood maps for Swan Quarter are on the NC Flood Risk Information System.
Swan Quarter weather and underwater demolition scheduling
Sitting near 7 feet, Swan Quarter has hot, sticky summers, mild winters and Atlantic hurricane season from June through November. For underwater demolition in Swan Quarter, aim for November through April: milder weather and firmer ground once the storm season eases. Avoid August and September if you can, given the height of storm season, when heat and flooding halt work.
For Swan Quarter, the regional storm record includes this: hurricane Isabel in September 2003 pushed storm surge across the Outer Banks and the northeastern sounds, damaging thousands of homes.
Swan Quarter underwater demolition pricing factors
Beyond size, materials and access, these Swan Quarter factors affect the price:
- Haul distance. With roughly 51 miles to the closest permitted site, fuller, fewer loads keep Swan Quarter haul costs down.
- Floodplain steps. Low Swan Quarter lots may need flood or coastal approvals first.
Map of our Swan Quarter underwater demolition area
Book underwater demolition in Swan Quarter
SWAN QUARTER · HYDE COUNTY
Need underwater demolition in Swan Quarter?
Get a fixed underwater demolition price for your Swan Quarter property after a free visit.